Name: | THERMOCAL MINERALS OF IDAHO LLC |
Jurisdiction: | Idaho |
Legal type: | Limited Liability Company (D) |
Status: | Active-Existing |
Date of registration: | 29 Mar 2002 (23 years ago) |
Financial Date End: | 31 Mar 2026 |
Entity Number: | 69656 |
Place of Formation: | IDAHO |
File Number: | 69656 |
Principal Address: | P.O. BOX 27 SIOUX CITY, IA 51102 |
Mailing Address: | FINANCE 3689 460TH ST ORANGE CITY, IA 51041-7561 |
Name | Role | Address |
---|---|---|
CORPORATION SERVICE COMPANY | Agent | 1305 12TH AVE RD, NAMPA, ID 83686 |
Name | Role | Address | Appointed On | Resigned On |
---|---|---|---|---|
Ron Van Beek | Manager | 3689 460TH STREET, ORANGE CITY, IA 51041 | 2021-02-08 | 2024-03-18 |
Name | Role | Address | Appointed On |
---|---|---|---|
Ron Van Beek | Member | 3689 460TH STREET, ORANGE CITY, IA 51041 | 2024-03-18 |
Filing Name | Filing Number | Filing date |
---|---|---|
Annual Report | 0006140740 | 2025-03-04 |
Annual Report | 0005652372 | 2024-03-18 |
Annual Report | 0005172399 | 2023-03-31 |
Registered Agent Name/Address Change (mass change) | 0004638762 | 2022-03-08 |
Annual Report | 0004589515 | 2022-02-03 |
Registered Agent Name/Address Change (mass change) | 0004464360 | 2021-10-29 |
Annual Report | 0004167773 | 2021-02-08 |
Annual Report | 0003845943 | 2020-04-15 |
Annual Report | 0003457455 | 2019-03-19 |
Annual Report | 0001180514 | 2018-02-19 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Thermocal Minerals of Idaho LLC | Surface | Active | Dimension Limestone | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Thermocal Minerals of Idaho LLC |
Role | Operator |
Start Date | 1950-01-01 |
Name | Ron Van Beek |
Role | Current Controller |
Start Date | 1950-01-01 |
Name | Thermocal Minerals of Idaho LLC |
Role | Current Operator |
Accidents
Accident Date | 2023-12-19 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Contact with hot objects or substances |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Employee touched a hot metal piece after welding a spot without gloves. Caused a burn on the palm of EE's right palm area. |
Accident Date | 2023-09-11 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Replacing a screen on a five deck screen, failed to hook the bottom hook correctly. The screen jumped hitting employee in the right ear. |
Accident Date | 2023-08-29 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Caught in, under or between running or meshing objects |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Employee was filling 50 pound bags of product. The employee activated the bagger unit while hand was under the pneumatic bag holder. The bag holder pinched employee's right little finger. |
Accident Date | 2022-11-16 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Over-exertion NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | EE exited a truck, put right foot on the ground and slipped off the steps of the vehicle. EE did not fall to the ground, as EE was holding onto the handrail. EE twisted right knee. |
Accident Date | 2022-08-18 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Absorption of radiations, caustics, toxic and noxious substances |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | EE dropped a piece of trash into a trash can. The item fell onto the cement. EE picked up the trash and was bitten by a snake. The snake was hidden in a small piece of rubber belting. Employees attempted to find the snake without success. |
Accident Date | 2022-08-16 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Contract employee was replacing a tire on a haul truck. The crane/forklift arm slipped, hitting CE on the top of the head. CE was wearing the required safety gear, a hardhat. |
Accident Date | 2022-02-15 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck against a moving object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | EE struck their head on a door handle of a 320 loader. |
Accident Date | 2021-04-29 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | EE was driving T post in the ground at each gate opening. The post driver came off the T post and the top of the drive hit EE in the head causing a laceration to EE's head. |
Accident Date | 2020-03-23 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck against stationary object |
Ocupation | Miner, Prospector, NEC |
Narrative | EE was walking down the stairs and EE's left boot got stuck on the rung. The boot slipped off EE's foot. EE put EE's boot back into the boot. The large toe nail hooked the safety toe edge. The toe nail pulled up and away from the skin. |
Accident Date | 2019-03-11 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Contact with hot objects or substances |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | An employee was lighting a propane weed burner to heat the under side of a hammer mill. EE must have let the propane run too long before trying to light it. It apparently accumulated gas under the hammer mill flashing when EE lit it. It burned EE's face and hand. |
Accident Date | 2018-08-30 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Contact with hot objects or substances |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Employee tried to start a fire in a furnace attached to a cyclone. EE decided to use gasoline to start the fire. EE opened the door because ee thought it had not ignited. It allowed air to rush in which caused the gas to ignite quickly. It burned right arm and slightly right cheek. |
Accident Date | 2014-03-06 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Ball/Rod/Pebble/Hand/Limestone/Dry mill operator, Roller operator |
Narrative | He reached up to release the garage door opener and the rod hit him in the forehead. |
Accident Date | 2011-03-31 |
Degree Inhury | DAYS RESTRICTED ACTIVITY ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Bent over to pick up 2 gal bucket of coal - strained back. |
Accident Date | 2009-03-09 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Bent over to pick up wire, sprained back. Was given 5 days off to heal, managers decision. |
Accident Date | 2008-04-07 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Bodily reaction, NEC |
Ocupation | Prep plant foreman, Supervisor, Mill plant supervisor, Kiln supervisor |
Narrative | Stooped down to pick up hammer. |
Accident Date | 2005-06-14 |
Degree Inhury | INJURIES DUE TO NATURAL CAUSES |
Accident Type | NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Was working on gate at the entrance of private homestead to keep the cows inside of homestead pasture. Suffered heart attack while working cows. |
Inspections
Start Date | 2024-09-12 |
End Date | 2024-09-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 18.5 |
Start Date | 2024-03-11 |
End Date | 2024-03-13 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 29.25 |
Start Date | 2023-07-30 |
End Date | 2023-07-31 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 9.5 |
Start Date | 2023-06-26 |
End Date | 2023-06-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 31.5 |
Start Date | 2022-11-16 |
End Date | 2022-11-23 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 31.5 |
Start Date | 2022-06-27 |
End Date | 2022-06-30 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 39 |
Start Date | 2021-12-27 |
End Date | 2022-01-10 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 45 |
Start Date | 2021-05-25 |
End Date | 2021-05-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 28.5 |
Start Date | 2021-05-24 |
End Date | 2021-05-24 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 1.25 |
Start Date | 2020-10-26 |
End Date | 2020-11-03 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 47.5 |
Start Date | 2020-03-09 |
End Date | 2020-03-10 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 18.5 |
Start Date | 2020-01-13 |
End Date | 2020-01-27 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 9.5 |
Start Date | 2020-01-08 |
End Date | 2020-01-10 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 35 |
Start Date | 2019-09-16 |
End Date | 2019-09-16 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 12.5 |
Start Date | 2019-09-06 |
End Date | 2019-09-06 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 11 |
Start Date | 2019-08-27 |
End Date | 2019-08-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 36.5 |
Start Date | 2019-01-15 |
End Date | 2019-01-15 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 4.25 |
Start Date | 2018-12-12 |
End Date | 2018-12-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.25 |
Start Date | 2018-09-17 |
End Date | 2018-09-18 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 16.75 |
Start Date | 2018-08-08 |
End Date | 2018-08-08 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 9 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2024 |
Annual Hours | 300 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 150 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2024 |
Annual Hours | 12364 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 1766 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2024 |
Annual Hours | 2153 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2153 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2023 |
Annual Hours | 11696 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1462 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2023 |
Annual Hours | 1859 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 930 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2022 |
Annual Hours | 4307 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1077 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2022 |
Annual Hours | 11998 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 2000 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2022 |
Annual Hours | 2905 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1453 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2021 |
Annual Hours | 4760 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1190 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2021 |
Annual Hours | 9186 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1837 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2021 |
Annual Hours | 2144 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2144 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2020 |
Annual Hours | 6234 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1559 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2020 |
Annual Hours | 8063 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2016 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2020 |
Annual Hours | 2454 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2454 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2019 |
Annual Hours | 2980 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 993 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2019 |
Annual Hours | 6935 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1734 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2019 |
Annual Hours | 1490 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 1490 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2018 |
Annual Hours | 980 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 980 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2018 |
Annual Hours | 10300 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2060 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2018 |
Annual Hours | 3000 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1500 |
Directions to Mine | From Leadore south on Highway 28 to Clear Creek Road then twelve miles to the mine site. |
Parties
Name | Thermocal Minerals of Idaho LLC |
Role | Operator |
Start Date | 2019-04-12 |
Name | Ron Van Beek |
Role | Current Controller |
Start Date | 2019-04-12 |
Name | Thermocal Minerals of Idaho LLC |
Role | Current Operator |
Date of last update: 21 Apr 2025
Sources: Idaho Secretary of State