Transaction Description:
THE WOOD HYDRO LIMITED LIABILITY COMPANY, DIETRICH DROP HYDROELECTRIC PROJECT, WILL IMPROVE THE SAFETY OF THE DAM. THE PROJECT WILL REPLACE THE INLET CONTROL GATE UPSTREAM FROM THE EXISTING TRASH RACK AND RAKE ASSEMBLIES, RE-LOCATE AND RE-PURPOSE THE EXIT CHANNEL GATE. THESE IMPROVEMENTS WILL ALLOW THE SYSTEM TO OPERATE MORE RELIABLY AND ALLOW THE SYSTEM TO REACT TO HYDROLOGICAL CONDITIONS BY PREVENTING CANAL WASHOUTS DURING OUTAGES AND OTHER SYSTEM EVENTS. THE FACILITY BEGAN OPERATION IN 1988 AND IS LOCATED ON THE MILNER- GOODING CANAL IN DIETRICH, IDAHO.