Name: | SUPREME INTERIORS CONSTRUCTION LLC |
Jurisdiction: | Idaho |
Legal type: | Limited Liability Company (D) |
Status: | Active-Existing |
Date of registration: | 13 Oct 2017 (8 years ago) |
Financial Date End: | 31 Oct 2025 |
Entity Number: | 575122 |
Place of Formation: | IDAHO |
File Number: | 575122 |
ZIP code: | 83686 |
County: | Canyon County |
Principal Address: | 2124 W CABOT AVE NAMPA, ID 83686 |
Mailing Address: | 7903 S RAFAEL WAY BOISE, ID 83709-7385 |
Name | Role | Address |
---|---|---|
RICARDO GARIBAY | Agent | 7903 S RAFAEL WAY, BOISE, ID 83709-7385 |
Name | Role | Address | Appointed On | Resigned On |
---|---|---|---|---|
RICARDO GARIBAY GUILLEN | Member | 7903 S RAFAEL WAY, BOISE, ID 83709 | 2020-09-07 | No data |
JORGE GARIBAY GUILLEN | Member | 2124 W CABOT AVE, NAMPA, ID 83686-4847 | 2023-09-05 | 2023-09-05 |
Filing Name | Filing Number | Filing date |
---|---|---|
Annual Report | 0005904005 | 2024-09-18 |
Annual Report | 0005383065 | 2023-09-05 |
Annual Report | 0004884314 | 2022-09-06 |
Annual Report | 0004411493 | 2021-09-08 |
Annual Report | 0003998106 | 2020-09-07 |
Annual Report | 0003633212 | 2019-10-01 |
Annual Report | 0003370460 | 2018-12-12 |
Initial Filing | 0000575122 | 2017-10-13 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
346867807 | 1032500 | 2023-07-25 | 3225 GREENHURST RD, NAMPA, ID, 83687 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1686879 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1686726 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1686852 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1686690 |
Safety | Yes |
Inspection Type | Complaint |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2020-08-14 |
Case Closed | 2022-06-10 |
Related Activity
Type | Complaint |
Activity Nr | 1644471 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1494266 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1489832 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1489839 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260451 G01 |
Issuance Date | 2020-11-05 |
Current Penalty | 3200.0 |
Initial Penalty | 5398.0 |
Final Order | 2020-12-14 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level. (a) On August 14,2020; an employee was exposed to fall hazards of approximately 27 feet to the ground surface below, when applying tape to drywall seams while working from the west end of the second platform of Werner, SRS-72 scaffolds. NOTE - Abatement documentation and certification are NOT required for this item. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260451 G04 I |
Issuance Date | 2020-11-05 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2020-12-14 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. (a) On August 14,2020; an employee was exposed to fall hazards of approximately 27 feet to the ground surface below, when applying tape to drywall seams while working without guardrails from the west end of the second platform of Werner, SRS-72 scaffolds. NOTE - Abatement documentation and certification are required for this item. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260454 A |
Issuance Date | 2020-11-05 |
Abatement Due Date | 2020-11-18 |
Current Penalty | 3200.0 |
Initial Penalty | 5398.0 |
Final Order | 2020-12-14 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. (a) On August 14, 2020; an employee working on the second platform of a Warner, SRS-72 scaffold at heights of approximately 27 feet from the ground surface below had not been trained by a qualified person in order to recognize and minimize hazards associated with scaffold use. NOTE - Abatement documentation and certification are required for this item. |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6345517302 | 2020-04-30 | 1087 | PPP | 2124 W. CABOT AVE., NAMPA, ID, 83686 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Date of last update: 11 Apr 2025
Sources: Idaho Secretary of State