Search icon

MCALVAIN CONCRETE, INC.

Company Details

Name: MCALVAIN CONCRETE, INC.
Jurisdiction: Idaho
Legal type: General Business Corporation (D)
Status: Active-Good Standing
Date of registration: 12 Dec 2007 (17 years ago)
Financial Date End: 31 Dec 2025
Entity Number: 533359
Place of Formation: IDAHO
File Number: 533359
ZIP code: 83709
County: Ada County
Mailing Address: LICENSING DEPARTMENT 5559 W GOWEN RD BOISE, ID 83709-5626

Agent

Name Role Address
Torry M. McAlvain Agent 5559 WEST GOWEN RD, BOISE, ID 83709

President

Name Role Address Appointed On
Chuck Graves President 5559 W. GOWEN RD., BOISE, ID 83709 2020-11-17

Secretary

Name Role Address Appointed On Resigned On
Torry M. McAlvain Secretary 5559 W. GOWEN ROAD, BOISE, ID 83709 2023-12-21 2023-12-21

Treasurer

Name Role Address Appointed On Resigned On
Matthew Thiel Treasurer 5559 W. GOWEN ROAD., BOISE, ID 83709 2023-12-21 2023-12-21

Filing

Filing Name Filing Number Filing date
Annual Report 0006036892 2024-12-27
Annual Report 0005524760 2023-12-21
Annual Report 0005028886 2022-12-13
Annual Report 0004526368 2021-12-13
Annual Report 0004069620 2020-11-17
Annual Report 0003711090 2019-12-17
Annual Report 0003385488 2018-12-31
Annual Report 0003146110 2017-12-31
Annual Report 0003146112 2016-12-30
Annual Report 0003146109 2015-10-13

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
347851206 1032500 2024-10-30 11311 CHINDEN BLVD BLG 3, BOISE, ID, 83714
Inspection Type Planned
Scope NoInspection
Safety/Health Safety
Close Conference 2024-10-30
Emphasis N: CTARGET, P: CTARGET
Case Closed 2024-10-30
347145989 1032500 2023-12-06 120 N 12TH ST, BOISE, ID, 83702
Inspection Type Complaint
Scope Partial
Safety/Health Health
Close Conference 2023-12-06
Emphasis N: RCS-NEP
Case Closed 2024-02-29

Related Activity

Type Complaint
Activity Nr 2107421
Safety Yes
Health Yes
Type Inspection
Activity Nr 1714798
Safety Yes
347147985 1032500 2023-12-06 120 NORTH 12TH STREET, BOISE, ID, 83702
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2023-12-06
Emphasis L: CRANE, P: CTARGET, N: CTARGET
Case Closed 2024-05-24

Related Activity

Type Inspection
Activity Nr 1714824
Safety Yes
Type Inspection
Activity Nr 1714598
Health Yes
Type Complaint
Activity Nr 2107421
Safety Yes
Health Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260502 B13
Issuance Date 2024-02-29
Current Penalty 4940.0
Initial Penalty 7052.0
Final Order 2024-03-27
Nr Instances 1
Nr Exposed 20
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.502(b)(13): When guardrail systems were used around holes which were used as access (such as ladderways), they were not provided with a gate, or were not so offset that a person could not walk directly into the hole: a) On December 6, 2023, and times prior floor openings used for access to the next level were not properly guarded on all four sides. The gate used on level 17 was sprung open. Floor openings on level 18 and 19 had guardrails on three sides of the openings and no offset railing. This exposed employees to a 10-foot fall hazard to the lower level. Note) Corrected during inspection.
Citation ID 01002A
Citaton Type Serious
Standard Cited 19261419 A02
Issuance Date 2024-02-29
Current Penalty 0.0
Initial Penalty 8816.0
Final Order 2024-03-27
Nr Instances 1
Nr Exposed 3
Related Event Code (REC) Complaint
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1419(a)(2): A signal person was not provided when the equipment was traveling and the view in the direction of travel was obstructed: a) On November 28, 2023, a signal person was not used when the tower crane operator travelled the crane to their left (counterclockwise) over the active deck, and the counterweights could not be seen by the operator. Note: Abatement complete.
Citation ID 01002B
Citaton Type Serious
Standard Cited 19261419 F
Issuance Date 2024-02-29
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2024-03-27
Nr Instances 1
Nr Exposed 3
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1419(f): During operations requiring signals, the ability to transmit signals between the operator and signal person was not maintained: a) On November 28, 2023, during movement of the tower crane, the tower crane operator and the concrete placing pump operator were not in communication with each other. Note: Abatement complete
Citation ID 02001A
Citaton Type Other
Standard Cited 19260150 A02
Issuance Date 2024-02-29
Abatement Due Date 2024-03-06
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2024-03-27
Nr Instances 1
Nr Exposed 20
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.150(a)(2): Access to all available firefighting equipment was not maintained at all times: a) On December 6, 2023, a fire extinguisher on level 19 was blocked by construction debris. Note) Certification of corrective action is required for this item.
Citation ID 02001B
Citaton Type Other
Standard Cited 19260150 A04
Issuance Date 2024-02-29
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2024-03-27
Nr Instances 1
Nr Exposed 20
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.150(a)(4): All firefighting equipment was not periodically inspected and maintained in operating condition: a) On December 6, 2023, a portable fire extinguisher was missing a locking pin and did not indicate it was fully charged. Note) Corrected during inspection.
345234165 1032500 2021-04-05 701 VETERANS MEMORIAL PARKWAY, BOISE, ID, 83703
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2021-04-05
Emphasis L: FORKLIFT, N: CTARGET, P: CTARGET
Case Closed 2021-09-30

Related Activity

Type Referral
Activity Nr 1751177
Safety Yes
Type Inspection
Activity Nr 1523418
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260600 A06 I
Issuance Date 2021-08-02
Current Penalty 5222.7
Initial Penalty 7461.0
Final Order 2021-08-25
Nr Instances 1
Nr Exposed 3
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.600(a)(6)(i): For lines rated 50 kV or below, minimum clearance between the lines and any part of the load was not maintained at 10 feet; (a) Lander Waste Water Treatment Facility: On or about March 29, 2021, and at times prior thereto; the employer did not ensure employees were protected from the potential of electrocution. Employees hoisted a 16' h x 18' w Aluma beam with a JCB 509-42 Forklift when the forks made contact with the overhead primary and secondary power lines operating up to 12,470 volts.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260600 A06 IV
Issuance Date 2021-08-02
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2021-08-25
Nr Instances 1
Nr Exposed 3
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.600(a)(6)(iv): A person was not designated to observe clearance of the equipment and give timely warning for all operations where it is difficult for the operator to maintain the desired clearance by visual means: (a) Lander Waste Water Treatment Facility: On or about March 29, 2021 and at times prior thereto; the employer did not specifically assign an observer to be positioned so as to be able to visually monitor the clearance between the JCB 509-42 Forklift and the overhead primary and secondary power lines. Lines were operating up to 12,470 volts.
343464038 1032500 2018-09-13 8485 FEDERAL WAY, BOISE, ID, 83716
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2018-09-13
Emphasis N: CTARGET, P: CTARGET
Case Closed 2018-11-13

Related Activity

Type Inspection
Activity Nr 1346394
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Other
Standard Cited 19260651 J02
Issuance Date 2018-10-18
Abatement Due Date 2018-11-14
Current Penalty 0.0
Initial Penalty 2619.0
Final Order 2018-11-13
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(j)(2): Employees were not protected from excavated or other materials or equipment that posed a hazard by falling or rolling into excavations and protection was not provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary: (a) 8485 Federal Way: On or about September 13, 2018 and at times prior, employees were installing concrete forms and rebar in an excavation. The spoil pile was not at least 2 feet from the edge creating an approximately 6 feet deep excavation. Note: Abatement certification is required for this item.
Citation ID 01001B
Citaton Type Other
Standard Cited 19260651 K01
Issuance Date 2018-10-18
Abatement Due Date 2018-11-14
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-11-13
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems: (a) 8485 Federal Way: On or about September 13, 2018 and at times prior, employees were installing concrete forms and rebar in an excavation. The spoil pile was not at least 2 feet from the edge creating an approximately 6 feet deep excavation. Note: Abatement certification is required for this item.

Date of last update: 10 Apr 2025

Sources: Idaho Secretary of State