347851206
|
1032500
|
2024-10-30
|
11311 CHINDEN BLVD BLG 3, BOISE, ID, 83714
|
|
Inspection Type |
Planned
|
Scope |
NoInspection
|
Safety/Health |
Safety
|
Close Conference |
2024-10-30
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2024-10-30
|
|
347145989
|
1032500
|
2023-12-06
|
120 N 12TH ST, BOISE, ID, 83702
|
|
Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Health
|
Close Conference |
2023-12-06
|
Emphasis |
N: RCS-NEP
|
Case Closed |
2024-02-29
|
Related Activity
Type |
Complaint |
Activity Nr |
2107421 |
Safety |
Yes |
Health |
Yes |
|
Type |
Inspection |
Activity Nr |
1714798 |
Safety |
Yes |
|
|
347147985
|
1032500
|
2023-12-06
|
120 NORTH 12TH STREET, BOISE, ID, 83702
|
|
Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2023-12-06
|
Emphasis |
L: CRANE, P: CTARGET, N: CTARGET
|
Case Closed |
2024-05-24
|
Related Activity
Type |
Inspection |
Activity Nr |
1714824 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
1714598 |
Health |
Yes |
|
Type |
Complaint |
Activity Nr |
2107421 |
Safety |
Yes |
Health |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260502 B13 |
Issuance Date |
2024-02-29 |
Current Penalty |
4940.0 |
Initial Penalty |
7052.0 |
Final Order |
2024-03-27 |
Nr Instances |
1 |
Nr Exposed |
20 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.502(b)(13): When guardrail systems were used around holes which were used as access (such as ladderways), they were not provided with a gate, or were not so offset that a person could not walk directly into the hole: a) On December 6, 2023, and times prior floor openings used for access to the next level were not properly guarded on all four sides. The gate used on level 17 was sprung open. Floor openings on level 18 and 19 had guardrails on three sides of the openings and no offset railing. This exposed employees to a 10-foot fall hazard to the lower level. Note) Corrected during inspection. |
|
Citation ID |
01002A |
Citaton Type |
Serious |
Standard Cited |
19261419 A02 |
Issuance Date |
2024-02-29 |
Current Penalty |
0.0 |
Initial Penalty |
8816.0 |
Final Order |
2024-03-27 |
Nr Instances |
1 |
Nr Exposed |
3 |
Related Event Code (REC) |
Complaint |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1419(a)(2): A signal person was not provided when the equipment was traveling and the view in the direction of travel was obstructed: a) On November 28, 2023, a signal person was not used when the tower crane operator travelled the crane to their left (counterclockwise) over the active deck, and the counterweights could not be seen by the operator. Note: Abatement complete. |
|
Citation ID |
01002B |
Citaton Type |
Serious |
Standard Cited |
19261419 F |
Issuance Date |
2024-02-29 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2024-03-27 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1419(f): During operations requiring signals, the ability to transmit signals between the operator and signal person was not maintained: a) On November 28, 2023, during movement of the tower crane, the tower crane operator and the concrete placing pump operator were not in communication with each other. Note: Abatement complete |
|
Citation ID |
02001A |
Citaton Type |
Other |
Standard Cited |
19260150 A02 |
Issuance Date |
2024-02-29 |
Abatement Due Date |
2024-03-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2024-03-27 |
Nr Instances |
1 |
Nr Exposed |
20 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.150(a)(2): Access to all available firefighting equipment was not maintained at all times: a) On December 6, 2023, a fire extinguisher on level 19 was blocked by construction debris. Note) Certification of corrective action is required for this item. |
|
Citation ID |
02001B |
Citaton Type |
Other |
Standard Cited |
19260150 A04 |
Issuance Date |
2024-02-29 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2024-03-27 |
Nr Instances |
1 |
Nr Exposed |
20 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.150(a)(4): All firefighting equipment was not periodically inspected and maintained in operating condition: a) On December 6, 2023, a portable fire extinguisher was missing a locking pin and did not indicate it was fully charged. Note) Corrected during inspection. |
|
|
345234165
|
1032500
|
2021-04-05
|
701 VETERANS MEMORIAL PARKWAY, BOISE, ID, 83703
|
|
Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2021-04-05
|
Emphasis |
L: FORKLIFT, N: CTARGET, P: CTARGET
|
Case Closed |
2021-09-30
|
Related Activity
Type |
Referral |
Activity Nr |
1751177 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
1523418 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19260600 A06 I |
Issuance Date |
2021-08-02 |
Current Penalty |
5222.7 |
Initial Penalty |
7461.0 |
Final Order |
2021-08-25 |
Nr Instances |
1 |
Nr Exposed |
3 |
Related Event Code (REC) |
Referral |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.600(a)(6)(i): For lines rated 50 kV or below, minimum clearance between the lines and any part of the load was not maintained at 10 feet; (a) Lander Waste Water Treatment Facility: On or about March 29, 2021, and at times prior thereto; the employer did not ensure employees were protected from the potential of electrocution. Employees hoisted a 16' h x 18' w Aluma beam with a JCB 509-42 Forklift when the forks made contact with the overhead primary and secondary power lines operating up to 12,470 volts. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19260600 A06 IV |
Issuance Date |
2021-08-02 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2021-08-25 |
Nr Instances |
1 |
Nr Exposed |
3 |
Related Event Code (REC) |
Referral |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.600(a)(6)(iv): A person was not designated to observe clearance of the equipment and give timely warning for all operations where it is difficult for the operator to maintain the desired clearance by visual means: (a) Lander Waste Water Treatment Facility: On or about March 29, 2021 and at times prior thereto; the employer did not specifically assign an observer to be positioned so as to be able to visually monitor the clearance between the JCB 509-42 Forklift and the overhead primary and secondary power lines. Lines were operating up to 12,470 volts. |
|
|
343464038
|
1032500
|
2018-09-13
|
8485 FEDERAL WAY, BOISE, ID, 83716
|
|
Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2018-09-13
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2018-11-13
|
Related Activity
Type |
Inspection |
Activity Nr |
1346394 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Other |
Standard Cited |
19260651 J02 |
Issuance Date |
2018-10-18 |
Abatement Due Date |
2018-11-14 |
Current Penalty |
0.0 |
Initial Penalty |
2619.0 |
Final Order |
2018-11-13 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.651(j)(2): Employees were not protected from excavated or other materials or equipment that posed a hazard by falling or rolling into excavations and protection was not provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary: (a) 8485 Federal Way: On or about September 13, 2018 and at times prior, employees were installing concrete forms and rebar in an excavation. The spoil pile was not at least 2 feet from the edge creating an approximately 6 feet deep excavation. Note: Abatement certification is required for this item. |
|
Citation ID |
01001B |
Citaton Type |
Other |
Standard Cited |
19260651 K01 |
Issuance Date |
2018-10-18 |
Abatement Due Date |
2018-11-14 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2018-11-13 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems: (a) 8485 Federal Way: On or about September 13, 2018 and at times prior, employees were installing concrete forms and rebar in an excavation. The spoil pile was not at least 2 feet from the edge creating an approximately 6 feet deep excavation. Note: Abatement certification is required for this item. |
|
|