Star Pit
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Directions to Mine |
From MSHA office in Boise take State Street west becomes Hwy 44. Travel through Star to mile marker #8, turn south past marker and pit is visible.
|
Parties
Name
|
Sunroc Corporation
|
Role
|
Operator
|
Start Date
|
2016-10-03
|
|
Name
|
Marcum Sand & Gravel
|
Role
|
Operator
|
Start Date
|
1986-03-01
|
End Date
|
1987-02-25
|
|
Name
|
Marcum Asphalt & Gravel
|
Role
|
Operator
|
Start Date
|
1987-02-26
|
End Date
|
1992-09-20
|
|
Name
|
Low's Ready Mix Inc
|
Role
|
Operator
|
Start Date
|
1992-09-21
|
End Date
|
2016-10-02
|
|
Name
|
CCI (Clyde Companies Inc)
|
Role
|
Current Controller
|
Start Date
|
2016-10-03
|
|
Name
|
Sunroc Corporation
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2015-02-05
|
Degree Inhury |
INJURIES DUE TO NATURAL CAUSES
|
Accident Type |
NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee suffered a heart attack while walking to his service truck.
|
|
Accident Date |
2007-08-09
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck against stationary object
|
Ocupation |
Safety representative
|
Narrative |
EE was pushing down on the wrench, when it slipped . EE's thumb slammed down ont the metal surface.
|
|
Accident Date |
2004-03-17
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
EE WAS REPLACING AN EMPTY OIL BARREL WITH A FULL BARREL ON THE DRUM RACK. HE UPENDED A HORIZONTAL DRUM TO VERICAL POSITION IN ORDER TO INSTALL THE DISPENSING BUNGS.
|
|
Inspections
Start Date |
2017-06-27
|
End Date |
2017-06-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2016-12-20
|
End Date |
2016-12-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2016-08-23
|
End Date |
2016-08-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2015-12-09
|
End Date |
2015-12-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.75
|
|
Start Date |
2015-08-05
|
End Date |
2015-08-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2015-02-05
|
End Date |
2015-02-26
|
Activity |
Non-Chargeable Accident Investigation
|
Number Inspectors |
1
|
Total Hours |
19.5
|
|
Start Date |
2014-12-29
|
End Date |
2014-12-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2014-04-23
|
End Date |
2014-04-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2014-01-14
|
End Date |
2014-01-14
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Start Date |
2014-01-03
|
End Date |
2014-01-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2013-03-13
|
End Date |
2013-03-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.75
|
|
Start Date |
2012-02-29
|
End Date |
2012-02-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.75
|
|
Start Date |
2011-06-02
|
End Date |
2011-06-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2010-08-05
|
End Date |
2010-08-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2009-05-26
|
End Date |
2009-05-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2009-03-02
|
End Date |
2009-03-02
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2008-05-06
|
End Date |
2008-05-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2008-01-16
|
End Date |
2008-01-16
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2008-01-03
|
End Date |
2008-01-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.5
|
|
Start Date |
2007-07-17
|
End Date |
2007-07-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
12982
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2596
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
9152
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2288
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
2
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
7109
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2370
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
6378
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2126
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
6331
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2110
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
6172
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2057
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
5486
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1829
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
3414
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1138
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
2500
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1250
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
4124
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2062
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
17106
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2138
|
|
|
SUNROC-JOPLIN PIT
|
Surface
|
Active
|
Construction Sand and Gravel
|
|
Directions to Mine |
Joplin Road - Boise, ID.
|
Parties
Name
|
Matzdorff Resources LLC
|
Role
|
Operator
|
Start Date
|
2003-09-05
|
End Date
|
2008-03-27
|
|
Name
|
Clements Concrete Company
|
Role
|
Operator
|
Start Date
|
2010-09-16
|
End Date
|
2010-09-30
|
|
Name
|
Sunroc Corporation
|
Role
|
Operator
|
Start Date
|
2016-12-02
|
|
Name
|
Clements Concrete Company
|
Role
|
Operator
|
Start Date
|
2008-03-28
|
End Date
|
2010-09-15
|
|
Name
|
Clements Concrete Co
|
Role
|
Operator
|
Start Date
|
2010-10-01
|
End Date
|
2016-12-01
|
|
Name
|
CCI (Clyde Companies Inc)
|
Role
|
Current Controller
|
Start Date
|
2016-12-02
|
|
Name
|
Sunroc Corporation
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2018-12-06
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Employee was walking on site, carrying a compressed gas cylinder of Oxygen. The ground was frozen. The employee stepped onto a soft spot of ground and fell forward. The gas tank struck the ground and the employee landed on top of the edge of the tank; striking the right side of their collar bone.
|
|
Inspections
Start Date |
2024-10-02
|
End Date |
2024-10-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2024-06-24
|
End Date |
2024-06-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2024-01-31
|
End Date |
2024-01-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2023-12-29
|
End Date |
2023-12-29
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
1.5
|
|
Start Date |
2023-09-21
|
End Date |
2023-09-22
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2023-09-21
|
End Date |
2023-09-21
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
1.5
|
|
Start Date |
2023-08-08
|
End Date |
2023-08-08
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2023-08-08
|
End Date |
2023-08-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2023-03-08
|
End Date |
2023-03-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2022-12-28
|
End Date |
2022-12-28
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2022-05-18
|
End Date |
2022-05-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2022-01-04
|
End Date |
2022-01-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2021-06-07
|
End Date |
2021-06-07
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2021-05-24
|
End Date |
2021-05-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Start Date |
2020-12-14
|
End Date |
2020-12-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.75
|
|
Start Date |
2020-06-23
|
End Date |
2020-06-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2020-03-17
|
End Date |
2020-03-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2019-08-14
|
End Date |
2019-08-14
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2019-07-30
|
End Date |
2019-07-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
26.25
|
|
Start Date |
2019-01-24
|
End Date |
2019-01-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.75
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
13064
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2613
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
2333
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2333
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
12748
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2125
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
2481
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2481
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
11380
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2276
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
2292
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2292
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
13798
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2300
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
1914
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1914
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
13504
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2251
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
2109
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2109
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
18624
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2661
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
1941
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1941
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
22678
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2268
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
1900
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1900
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
25887
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2589
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
2017
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2017
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
25980
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2598
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
1785
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1785
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
27683
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
2517
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
1764
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1764
|
|
|
KPI/JCI P181944
|
Surface
|
Intermittent
|
Crushed, Broken Stone NEC
|
|
Directions to Mine |
1850 Tank Farm Road
|
Parties
Name
|
J K Merrill & Sons Incorporated
|
Role
|
Operator
|
Start Date
|
2009-05-12
|
End Date
|
2023-01-26
|
|
Name
|
Sunroc
|
Role
|
Operator
|
Start Date
|
2023-01-27
|
|
Name
|
CCI (Clyde Companies Inc)
|
Role
|
Current Controller
|
Start Date
|
2023-01-27
|
|
Name
|
Sunroc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2024-02-20
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee was cutting a rubber hose with a razor knife. Knife slipped cutting right upper leg just above knee.
|
|
Accident Date |
2023-01-13
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Crusher attendant/operator, Pan feeder operator/worker
|
Narrative |
Stepped down off of ladder and twisted right ankle. Felt a pop. Right ankle sprain.
|
|
Inspections
Start Date |
2024-01-09
|
End Date |
2024-01-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.5
|
|
Start Date |
2023-02-24
|
End Date |
2023-03-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.5
|
|
Start Date |
2022-09-02
|
End Date |
2022-09-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2021-06-22
|
End Date |
2021-06-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28.5
|
|
Start Date |
2010-08-04
|
End Date |
2010-08-04
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2009-08-26
|
End Date |
2009-08-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
10354
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2589
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
6613
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1653
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
3700
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
740
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
600
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
600
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
2593
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
519
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
32
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
32
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
534
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
267
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
250
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
250
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
541
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
180
|
|
|
Badger Pit
|
Surface
|
Active
|
Construction Sand and Gravel
|
|
Directions to Mine |
North on Pleasant valley road from Gown road. Around two miles pit on the east side of Pleasant valley road.
|
Parties
Name
|
C & A Paving Co
|
Role
|
Operator
|
Start Date
|
2013-08-23
|
End Date
|
2016-10-02
|
|
Name
|
Sunroc Corporation
|
Role
|
Operator
|
Start Date
|
2016-10-03
|
|
Name
|
CCI (Clyde Companies Inc)
|
Role
|
Current Controller
|
Start Date
|
2016-10-03
|
|
Name
|
Sunroc Corporation
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2024-12-18
|
End Date |
2024-12-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.25
|
|
Start Date |
2024-08-08
|
End Date |
2024-08-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2024-02-29
|
End Date |
2024-02-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2023-07-17
|
End Date |
2023-07-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2023-03-29
|
End Date |
2023-03-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2022-08-30
|
End Date |
2022-09-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2020-10-07
|
End Date |
2020-10-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.75
|
|
Start Date |
2019-12-30
|
End Date |
2019-12-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Start Date |
2019-08-29
|
End Date |
2019-08-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.25
|
|
Start Date |
2018-09-04
|
End Date |
2018-09-04
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.5
|
|
Start Date |
2018-08-06
|
End Date |
2018-08-06
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2018-07-19
|
End Date |
2018-07-20
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2017-02-10
|
End Date |
2017-02-10
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
2
|
Total Hours |
8.75
|
|
Start Date |
2017-01-19
|
End Date |
2017-01-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
27.5
|
|
Start Date |
2016-03-08
|
End Date |
2016-03-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24
|
|
Start Date |
2014-09-30
|
End Date |
2014-10-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.5
|
|
Start Date |
2014-05-27
|
End Date |
2014-05-27
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2014-05-27
|
End Date |
2014-06-03
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2014-03-12
|
End Date |
2014-03-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
7508
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2503
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
7185
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2395
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
7176
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2392
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
8356
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2785
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
6911
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2304
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
1529
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1529
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
9495
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2374
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
1146
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1146
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
2471
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
824
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
2537
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
423
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
11514
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1645
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
4481
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
896
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
9734
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1217
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
56
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
56
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
2737
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
684
|
|
|
Wash Plant
|
Surface
|
Intermittent
|
Construction Sand and Gravel
|
|
Directions to Mine |
Go south on I-15 s/US-20 from Idaho Falls. Follow I-15 S for 51 mile to Tank Farm Rd in Power County, take exit 58 from I-86 W, follow Tank Road for 1.7 mile. 1850 Tank Farm Road
|
Parties
Name
|
J.K. Merrill & Sons, Inc.
|
Role
|
Operator
|
Start Date
|
2013-10-22
|
End Date
|
2023-01-26
|
|
Name
|
Sunroc
|
Role
|
Operator
|
Start Date
|
2023-01-27
|
|
Name
|
CCI (Clyde Companies Inc)
|
Role
|
Current Controller
|
Start Date
|
2023-01-27
|
|
Name
|
Sunroc
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2023-10-30
|
End Date |
2023-11-03
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2023-10-11
|
End Date |
2023-10-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23.5
|
|
Start Date |
2022-05-02
|
End Date |
2022-05-02
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2022-04-07
|
End Date |
2022-04-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2021-04-06
|
End Date |
2021-04-06
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2021-03-25
|
End Date |
2021-03-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2020-08-13
|
End Date |
2020-08-13
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2020-08-04
|
End Date |
2020-08-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20
|
|
Start Date |
2019-07-24
|
End Date |
2019-07-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2017-10-24
|
End Date |
2017-10-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
26
|
|
Start Date |
2017-05-22
|
End Date |
2017-05-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24
|
|
Start Date |
2015-10-14
|
End Date |
2015-10-14
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2015-10-13
|
End Date |
2015-10-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2015-05-18
|
End Date |
2015-05-20
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2014-10-07
|
End Date |
2014-10-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28
|
|
Start Date |
2014-08-06
|
End Date |
2014-08-06
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2014-05-12
|
End Date |
2014-05-12
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2014-05-06
|
End Date |
2014-05-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
7201
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2400
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
4110
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1028
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
3522
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1174
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
25
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
25
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
3528
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1764
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
35
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
35
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
2028
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
676
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
78
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
78
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
2133
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
711
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
225
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
113
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
1246
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
415
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
208
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
208
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
1018
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
339
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
684
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
342
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
682
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
227
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
4519
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1506
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
1636
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1636
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
1729
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
216
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
635
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
635
|
|
|
Notus Pit Boise River Road
|
Surface
|
Active
|
Construction Sand and Gravel
|
|
Directions to Mine |
From Notus go south on Notus road, turn west on Boise River Road, go 1/4 mile on right.
|
Parties
Name
|
Sunroc
|
Role
|
Operator
|
Start Date
|
2016-12-29
|
|
Name
|
CCI (Clyde Companies Inc)
|
Role
|
Current Controller
|
Start Date
|
2016-12-29
|
|
Name
|
Sunroc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2023-11-17
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck by powered moving object
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Injured employee was assisting with maintenance of the wash plant. Other employee was backing up service truck and the bumper struck the injured employee in the right knee.
|
|
Accident Date |
2023-02-08
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by falling object
|
Ocupation |
Outside foreman, Leadman
|
Narrative |
Employee was working on a 10' 11/2 steel pipe on a table with a vise. The pipe rolled and dropped on the edge of the table crushing employee's left pinky finger. Laceration to left 5th finger.
|
|
Inspections
Start Date |
2024-11-25
|
End Date |
2024-11-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2024-08-01
|
End Date |
2024-08-01
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2024-07-29
|
End Date |
2024-07-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2023-11-21
|
End Date |
2023-11-21
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2023-11-21
|
End Date |
2023-11-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2023-07-19
|
End Date |
2023-07-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2023-05-17
|
End Date |
2023-05-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Start Date |
2023-03-28
|
End Date |
2023-03-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2022-06-15
|
End Date |
2022-06-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2021-12-28
|
End Date |
2021-12-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2021-05-26
|
End Date |
2021-05-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2020-10-07
|
End Date |
2020-10-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2020-07-06
|
End Date |
2020-07-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Start Date |
2020-02-26
|
End Date |
2020-02-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.25
|
|
Start Date |
2019-02-26
|
End Date |
2019-02-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.5
|
|
Start Date |
2018-02-14
|
End Date |
2018-02-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.75
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
17710
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2530
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
13938
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2323
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
13863
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1980
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
16574
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2762
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
15184
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2169
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
17410
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2487
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
19004
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2376
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
1699
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
340
|
|
|