Search icon

HHS CONSTRUCTION, LLC

Company Details

Name: HHS CONSTRUCTION, LLC
Jurisdiction: Idaho
Legal type: Limited Liability Company (D)
Status: Active-Existing
Date of registration: 18 Dec 2014 (10 years ago)
Financial Date End: 31 Dec 2025
Entity Number: 443205
Place of Formation: IDAHO
File Number: 443205
ZIP code: 83616
County: Ada County
Principal Address: 729 S BRIDGEWAY PLACE EAGLE, ID 83616
Mailing Address: 923 S BRIDGEWAY PL EAGLE, ID 83616-6098

Manager

Name Role Address Appointed On
JAMES H HUNTER Manager 923 S BRIDGEWAY PLACE, EAGLE, ID 83616 2020-12-04

Agent

Name Role Address
JOHN MARSHALL Agent 1112 W MAIN ST, STE 504, BOISE, ID 83702

Filing

Filing Name Filing Number Filing date
Annual Report 0005965273 2024-11-05
Annual Report 0005457069 2023-11-03
Annual Report Amendment 0005027429 2022-12-12
Annual Report 0005000228 2022-11-23
Annual Report 0004474218 2021-11-01
Statement of Change of Business Mailing Address 0004444119 2021-10-12
Annual Report 0004088635 2020-12-04
Annual Report 0003708814 2019-12-13
Annual Report 0003402571 2019-01-18
Annual Report 0002879656 2018-01-11

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
344109525 1032500 2019-06-25 2911 E LAWTON DR, MERIDIAN, ID, 83642
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2019-06-25
Emphasis L: FALL
Case Closed 2021-02-24

Related Activity

Type Referral
Activity Nr 1469479
Safety Yes
Type Inspection
Activity Nr 1410962
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260100 A
Issuance Date 2019-07-15
Abatement Due Date 2019-07-25
Current Penalty 3000.0
Initial Penalty 3978.0
Contest Date 2019-08-13
Final Order 2020-06-18
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: (a) Employees of a subcontractor were exposed to overhead hazards when working below others engaged in truss work, sheathing, and other framing activities. NOTE: Certification of corrective action is required for this item.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260102 A01
Issuance Date 2019-07-15
Abatement Due Date 2019-07-25
Current Penalty 3000.0
Initial Penalty 3978.0
Contest Date 2019-08-13
Final Order 2020-06-18
Nr Instances 1
Nr Exposed 2
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation: (a) Employees of a subcontractor engaged in wood framing of a new home were not wearing safety glasses while using equipment such as nail guns and power saws. NOTE: Certification of corrective action is required for this item.
Citation ID 02001A
Citaton Type Repeat
Standard Cited 19260020 B02
Issuance Date 2019-07-15
Abatement Due Date 2019-08-29
Current Penalty 6630.0
Initial Penalty 13261.0
Contest Date 2019-08-13
Final Order 2020-06-18
Nr Instances 1
Nr Exposed 3
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s): a) The controlling employer, HHS Construction, LLC dba Boise Hunter Homes did not identify or have an effective system in place to identify and correct hazards to which their subcontractors were exposed. These hazards include but may not be limited to fall hazards ranging from 11 feet to 18 feet to the ground below when performing framing activities. b) The controlling employer, HHS Construction, LLC dba Boise Hunter Homes did not identify or have an effective system in place to identify and correct hazards to which their subcontractors were exposed. These hazards include but may not be limited to not wearing personal protective equipment (hard hats and safety glasses) when needed. HHS Construction, LLC dba Boise Hunter Homes was previously cited for a violation of this occupational safety and health standard, 29 CFR1926.20(b)(2) which was contained in OSHA inspection number 1333471, citation 1, item 1a, and was affirmed as a final order on September 14, 2018, with respect to a workplace located at 3842 Millbrook Way, Boise, ID 83712. Note) Certification of corrective actions are required for these items.
Citation ID 02001B
Citaton Type Repeat
Standard Cited 19260501 B13
Issuance Date 2019-07-15
Abatement Due Date 2019-07-25
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2019-08-13
Final Order 2020-06-18
Nr Instances 1
Nr Exposed 3
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): (a) Employees of a subcontractor engaged in wood framing activities for a new single family home, including truss installation, securing, and sheathing, were exposed to fall hazards from 11.7 to 18 feet high. The roof was estimated between 6:12 to 8:12 pitch. HHS Construction, LLC dba Boise Hunter Homes was previously cited for a violation of this occupational safety and health standard 29 CFR1926.501(b)(13), which was contained in OSHA inspection number 1333471, citation 1, item 1b, and was affirmed as a final order on September 11, 2018, with respect to a workplace located at 3842 Millbrook Way, Boise, ID 83712. NOTE: Certification of corrective action is required for this item.
343334710 1032500 2018-07-19 3842 MILLBROOK WAY, BOISE, ID, 83712
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2018-07-19
Case Closed 2018-09-27

Related Activity

Type Inspection
Activity Nr 1332699
Safety Yes
Type Inspection
Activity Nr 1332002
Safety Yes
Type Inspection
Activity Nr 1332049
Safety Yes
Type Referral
Activity Nr 1361880
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260020 B02
Issuance Date 2018-08-15
Abatement Due Date 2018-10-02
Current Penalty 2217.0
Initial Penalty 4434.0
Final Order 2018-09-14
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s) (a) 3842 Millbrook Way, Boise, ID 83712 on July 19, 2018; as the controlling employer, Boise Hunter Homes, LLC did not ensure that employees of a subcontractor working from heights measuring 10'7" were provided training to recognize hazards when working from heights or that they were wearing the appropriate personal fall protection. NOTE: Abatement certification IS required for this item.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260501 B13
Issuance Date 2018-08-15
Abatement Due Date 2018-08-27
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-09-14
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): (a) 3842 Millbrook Way, Boise, ID 83712, on July 19, 2018; as the controlling employer, Boise Hunter Homes, LLC did not ensure employees of a subcontractor working from heights measuring 10'7" were wearing fall protection. NOTE: Abatement certification IS required for this item.
Citation ID 01001C
Citaton Type Serious
Standard Cited 19260503 A01
Issuance Date 2018-08-15
Abatement Due Date 2018-08-27
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-09-14
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee who might be exposed to fall hazards: (a) 3842 Millbrook Way, Boise, ID 83712 on July 19, 2018; as the controlling employer, Boise Hunter Homes, LLC did not ensure employees of a subcontractor working from heights of 10'7" were provided appropriate training. NOTE: Abatement certification IS required for this item.

Paycheck Protection Program

Loan Number Loan Funded Date SBA Origination Office Code Loan Delivery Method Borrower Street Address
5856567009 2020-04-06 1087 PPP 729 S. BRIDGEWAY PL, EAGLE, ID, 83616-6096
Loan Status Date 2021-03-20
Loan Status Paid in Full
Loan Maturity in Months 24
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 692100
Loan Approval Amount (current) 692100
Undisbursed Amount 0
Franchise Name -
Lender Location ID 59698
Servicing Lender Name Umpqua Bank
Servicing Lender Address 445 SE Main St, First Fl, ROSEBURG, OR, 97470-4934
Rural or Urban Indicator U
Hubzone N
LMI N
Business Age Description Existing or more than 2 years old
Project Address EAGLE, ADA, ID, 83616-6096
Project Congressional District ID-02
Number of Employees 38
NAICS code 236117
Borrower Race Unanswered
Borrower Ethnicity Unknown/NotStated
Business Type Limited Liability Company(LLC)
Originating Lender ID 59698
Originating Lender Name Umpqua Bank
Originating Lender Address ROSEBURG, OR
Gender Unanswered
Veteran Unanswered
Forgiveness Amount 697712.65
Forgiveness Paid Date 2021-02-09

Court Cases

Docket Number Nature of Suit Filing Date Disposition
2300579 Other Personal Injury 2023-12-27 missing
Circuit Ninth Circuit
Origin removed (began in the state court, removed to the district court)
Jurisdiction federal question
Jury Demand Defendant demands jury
Demanded Amount 0
Termination Class Action Missing
Procedural Progress Missing
Nature Of Judgment Missing
Judgement missing
Arbitration On Termination Missing
Office 2
Filing Date 2023-12-27
Termination Date 1900-01-01
Section 1391
Status Pending

Parties

Name TULLIS,
Role Plaintiff
Name HHS CONSTRUCTION, LLC
Role Defendant

Date of last update: 07 Apr 2025

Sources: Idaho Secretary of State