Search icon

Markham Builders LLC

Company Details

Name: Markham Builders LLC
Jurisdiction: Idaho
Legal type: Foreign Limited Liability Company
Status: Active-Existing
Date of registration: 16 Jul 2021 (4 years ago)
Financial Date End: 31 Jul 2025
Entity Number: 4351229
Place of Formation: WASHINGTON
File Number: 772891
Principal Address: 717 W SPRAGUE AVE STE 800 SPOKANE, WA 99201
Mailing Address: STE 800 717 W SPRAGUE AVE SPOKANE, WA 99201-3911

Manager

Name Role Address Appointed On
Ammon Adams Manager 717 W SPRAGUE AVE, SPOKANE, WA 99201-3911 2023-07-10
David Weeks Manager 717 W SPRAGUE AVE, SPOKANE, WA 99201-3911 2023-07-10
Melissa Wells Manager 717 W SPRAGUE AVE, SPOKANE, WA 99201-3911 2023-07-10
Jerry Reed Manager 717 W SPRAGUE AVE, SPOKANE, WA 99201-3911 2023-07-10
John J Hemmingson Manager 717 W SPRAGUE AVE, SPOKANE, WA 99201-3911 2022-07-22
Lisa Briner Manager 717 W SPRAGUE AVE, SPOKANE, WA 99201-3911 2023-07-10

Agent

Name Role Address
MELISSA WELLS Agent 1221 W EMMA AVE, STE 300, COEUR D ALENE, ID 83814

Filing

Filing Name Filing Number Filing date
Annual Report 0005821514 2024-07-16
Annual Report 0005315008 2023-07-10
Annual Report 0004829563 2022-07-22
Initial Filing 0004351229 2021-07-16

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
346131626 1032500 2022-08-04 5359 E HOPE ST LOT 7, BLOCK 31, POST FALLS, ID, 83854
Inspection Type Unprog Rel
Scope Partial
Safety/Health Health
Close Conference 2022-08-04
Emphasis N: HEATNEP, N: RCS-NEP
Case Closed 2022-11-14

Related Activity

Type Referral
Activity Nr 1936545
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Other
Standard Cited 19261153 I01
Issuance Date 2022-10-18
Abatement Due Date 2022-12-06
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2022-11-16
Nr Instances 1
Nr Exposed 2
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1153(i)(1): The employer did not include respirable crystalline silica in the program established to comply with the hazard communication standard (HCS) (29 CFR 1910.1200): a) At the jobsite located at 5359 E Hope St., Post Falls, ID, on 08-04-2022, the controlling employer failed to ensure a subcontractor engaged in siding installation included fiber cement board containing crystalline silica in their hazard communication program. Contractor employees were cutting fiber cement siding with a handheld circular saw, without an integrated water delivery or dust collection system. A safety data sheet (SDS) was not available and worker training was not provided.

Date of last update: 16 Apr 2025

Sources: Idaho Secretary of State