Search icon

CHOBANI IDAHO, LLC

Headquarter

Company Details

Name: CHOBANI IDAHO, LLC
Jurisdiction: Idaho
Legal type: Limited Liability Company (D)
Status: Inactive-Merged Out
Date of registration: 13 Mar 2014 (11 years ago)
Financial Date End: 31 Mar 2020
Date dissolved: 02 Dec 2019
Entity Number: 413593
Place of Formation: IDAHO
File Number: 413593
Principal Address: 147 STATE HIGHWAY 320 NORWICH, NY 13815
Mailing Address: 147 STATE HIGHWAY 320 NORWICH, NY 13815-3561

Links between entities

Type Company Name Company Number State
Headquarter of CHOBANI IDAHO, LLC, NEW YORK 4552055 NEW YORK

Agent

Name Role Address
CORPORATION SERVICE COMPANY Agent 1305 12TH AVE RD, NAMPA, ID 83686

Filing

Filing Name Filing Number Filing date
Registered Agent Name/Address Change (mass change) 0004647987 2022-03-08
Registered Agent Name/Address Change (mass change) 0004473283 2021-10-29
Statement of Merger (Non-Survivor) 0003696301 2019-12-02
Annual Report 0003452159 2019-03-13
Annual Report 0002767965 2018-02-21
Annual Report 0002767963 2017-02-08
Annual Report 0002767961 2016-01-20
Annual Report 0002767959 2015-01-29
Initial Filing 0000413593 2014-03-13

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
342886546 1032500 2018-01-08 3450 KIMBERLY RD, TWIN FALLS, ID, 83301
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2018-01-10
Emphasis N: CHEMNEP, P: CHEMNEP
Case Closed 2018-09-27

Related Activity

Type Referral
Activity Nr 1288905
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19100037 A02
Issuance Date 2018-04-09
Abatement Due Date 2018-07-01
Current Penalty 5890.0
Initial Penalty 7853.0
Final Order 2018-05-04
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.37(a)(2): Exit routes were not arranged so that employees did not have to travel toward a high hazard area: (a) Refrigeration Building: On or about December 1, 2018 and at times prior, employees exited from the utilities manager's office into the compressor area where an ammonia leak was occurring. Note: Abatement certification is required for this item.
Citation ID 01002
Citaton Type Other
Standard Cited 19100119 D03 I
Issuance Date 2018-04-09
Current Penalty 0.0
Initial Penalty 4005.0
Final Order 2018-05-04
Nr Instances 6
Nr Exposed 8
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(d)(3)(i): 29 CFR 1910.119(d)(3)(i): Process safety information pertaining to the equipment in the process did not include the elements specified in 29 CFR 1910.119(d)(3)(i)(A) through (H): (a) Refrigeration Building: On or about January 8, 2018 and at times prior, the oil return lines on compressor 200 had isolation valve B31 identified as B37 on the drawings, solenoid valve/strainer unit B32 identified as B37 on the drawings, and solenoid valve/strainer unit B38 identified as B32 on the drawings. (b) Refrigeration Building: On or about January 8, 2018 and at times prior, the oil return lines on compressor 300 had isolation valve B31 identified as B37 on the drawings, solenoid valve/strainer unit B32 identified as B37 on the drawings, and solenoid valve/strainer unit B38 identified as B32 on the drawings. (c) Refrigeration Building: On or about January 8, 2018 and at times prior, the oil return lines on compressor 400 had isolation valve B31 identified as B37 on the drawings, solenoid valve/strainer unit B32 identified as B37 on the drawings, and solenoid valve/strainer unit B38 identified as B32 on the drawings. (d) Refrigeration Building: On or about January 8, 2018 and at times prior, the oil return lines on compressor 500 had isolation valve B31 identified as B37 on the drawings, solenoid valve/strainer unit B32 identified as B37 on the drawings, and solenoid valve/strainer unit B38 identified as B32 on the drawings. (e) Refrigeration Building: On or about January 8, 2018 and at times prior, the oil return lines on compressor 600 had isolation valve B31 identified as B37 on the drawings, solenoid valve/strainer unit B32 identified as B37 on the drawings, and solenoid valve/strainer unit B38 identified as B32 on the drawings. (f) Refrigeration Building: On or about January 8, 2018 and at times prior, the oil return lines on compressor 700 had isolation valve B31 identified as B37 on the drawings, solenoid valve/strainer unit B32 identified as B37 on the drawings, and solenoid valve/strainer unit B38 identified as B32 on the drawings. Note: Abatement certification is not required for this item. Fixed at the time of inspection.
Citation ID 01003A
Citaton Type Serious
Standard Cited 19100119 F01 IV
Issuance Date 2018-04-09
Abatement Due Date 2018-07-01
Current Penalty 12934.0
Initial Penalty 12934.0
Final Order 2018-05-04
Nr Instances 6
Nr Exposed 8
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(f)(1)(iv): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and addressed safety systems and their functions. (a) Refrigeration Building: On or about January 8, 2018 and at times prior, employees were using valve 2C59 to regulate liquid ammonia pressure in the High Pressure Liquid Line on compressor 200. (b) Refrigeration Building: On or about January 8, 2018 and at times prior, employees were using valve 3C59 to regulate liquid ammonia pressure in the High Pressure Liquid Line on compressor 300. (c) Refrigeration Building: On or about January 8, 2018 and at times prior, employees were using valve 4C59 to regulate liquid ammonia pressure in the High Pressure Liquid Line on compressor 400. (d) Refrigeration Building: On or about January 8, 2018 and at times prior, employees were using valve 5C59 to regulate liquid ammonia pressure in the High Pressure Liquid Line on compressor 500. (e) Refrigeration Building: On or about January 8, 2018 and at times prior, employees were using valve 6C59 to regulate liquid ammonia pressure in the High Pressure Liquid Line on compressor 600. (f) Refrigeration Building: On or about January 8, 2018 and at times prior, employees were using valve 7C59 to regulate liquid ammonia pressure in the High Pressure Liquid Line on compressor 700. Abatement certification and documentation is required for this item.
Citation ID 01003B
Citaton Type Serious
Standard Cited 19100119 I02 I
Issuance Date 2018-04-09
Abatement Due Date 2018-07-01
Current Penalty 0.0
Initial Penalty 12934.0
Final Order 2018-05-04
Nr Instances 6
Nr Exposed 8
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(i)(2)(i): Construction and equipment is not in accordance with design specifications; (a) Refrigeration Building: On or about January 8, 2018 and at times prior, valve 2C60 is used to regulate liquid ammonia pressure in the High Pressure Liquid Line on ammonia compressor 200. Valve 2C60 is installed on a vertical pipe, however, the manufacturer requires it to be installed on a horizontal pipe. (b) Refrigeration Building: On or about January 8, 2018 and at times prior, valve 3C60 is used to regulate liquid ammonia pressure in the High Pressure Liquid Line on ammonia compressor 300. Valve 3C60 is installed on a vertical pipe, however, the manufacturer requires it to be installed on a horizontal pipe. (c) Refrigeration Building: On or about January 8, 2018 and at times prior, valve 4C60 is used to regulate liquid ammonia pressure in the High Pressure Liquid Line on ammonia compressor 400. Valve 4C60 is installed on a vertical pipe, however, the manufacturer requires it to be installed on a horizontal pipe. (d) Refrigeration Building: On or about January 8, 2018 and at times prior, valve 5C60 is used to regulate liquid ammonia pressure in the High Pressure Liquid Line on ammonia compressor 500. Valve 5C60 is installed on a vertical pipe, however, the manufacturer requires it to be installed on a horizontal pipe. (e) Refrigeration Building: On or about January 8, 2018 and at times prior, valve 6C60 is used to regulate liquid ammonia pressure in the High Pressure Liquid Line on ammonia compressor 600. Valve 6C60 is installed on a vertical pipe, however, the manufacturer requires it to be installed on a horizontal pipe. (f) Refrigeration Building: On or about January 8, 2018 and at times prior, valve 7C60 is used to regulate liquid ammonia pressure in the High Pressure Liquid Line on ammonia compressor 700. Valve 7C60 is installed on a vertical pipe, however, the manufacturer requires it to be installed on a horizontal pipe. Abatement certification and documentation is required for this item.
Citation ID 01005
Citaton Type Other
Standard Cited 19100119 N
Issuance Date 2018-04-09
Abatement Due Date 2018-07-01
Current Penalty 2356.0
Initial Penalty 4712.0
Final Order 2018-05-04
Nr Instances 1
Nr Exposed 8
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(n): The emergency action plan did not contain procedures for handling small releases. (a) Refrigeration Building: On or about January 8, 2018 and at times prior, employees are to respond to incidental releases of ammonia and the emergency action plan does not have specific procedures for handling releases, including instructing employees how to distinguish between small and large spills. Note: Abatement certification is required for this item.
Citation ID 02001
Citaton Type Other
Standard Cited 19100119 G03
Issuance Date 2018-04-09
Abatement Due Date 2018-05-03
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-05-04
Nr Instances 1
Nr Exposed 8
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(g)(3): The employer did not maintain a record of training for employees operating a covered process. (a) Refrigeration Building: On or about January 8, 2018 and at times prior, employees operate ammonia refrigeration system. Note: Abatement certification is required for this item.

Date of last update: 14 Mar 2025

Sources: Idaho Secretary of State