Search icon

Mountain River Plumbing inc.

Company Details

Name: Mountain River Plumbing inc.
Jurisdiction: Idaho
Legal type: General Business Corporation (D)
Status: Inactive-Dissolved (Administrative)
Date of registration: 17 May 2019 (6 years ago)
Financial Date End: 31 May 2020
Date dissolved: 05 Aug 2020
Entity Number: 3515828
Place of Formation: IDAHO
File Number: 666698
ZIP code: 83201
County: Bannock County
Mailing Address: 706 E POPLAR ST POCATELLO, ID 83201-3755

Agent

Name Role Address
NORTHWEST REGISTERED AGENT LLC Agent 784 S CLEARWATER LOOP STE B, POST FALLS, ID 83854

Filing

Filing Name Filing Number Filing date
Dissolution/Revocation - Administrative 0003959636 2020-08-05
Initial Filing 0003515828 2019-05-17

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
342319449 1032500 2017-05-10 603 S 10TH, POCATELLO, ID, 83202
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2017-05-10
Emphasis N: TRENCH
Case Closed 2019-03-04

Related Activity

Type Referral
Activity Nr 1212901
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260651 C02
Issuance Date 2017-05-17
Abatement Due Date 2017-07-05
Current Penalty 2173.0
Initial Penalty 2173.0
Final Order 2017-06-28
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees. a) On or about May 10, 2017 or prior thereto: A ladder was not provided in a trench with a depth of 9 feet. Workers were installing a sewer line at a residence. NOTE: Abatement certification is required for this item.
Citation ID 01002A
Citaton Type Serious
Standard Cited 19260651 J02
Issuance Date 2017-05-17
Abatement Due Date 2017-07-05
Current Penalty 3803.0
Initial Penalty 3803.0
Final Order 2017-06-28
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(j)(2): Employees were not protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection was not provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. a) On or about May 10, 2017 or prior thereto: Spoil piles were placed on the edge of a trench that was 9 feet deep. Workers were installing a sewer line at a residence. NOTE: Abatement certification and documentation are required for this item.
Citation ID 01002B
Citaton Type Serious
Standard Cited 19260651 K01
Issuance Date 2017-05-17
Abatement Due Date 2017-07-05
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2017-06-28
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection was not conducted by the competent person prior to the start of work and as needed throughout the shift. a) On or about May 10, 2017 or prior thereto: Potential cave-in hazards were present on a 9 foot deep trench such as vertical walls, fissuring and spoil piles on the edge of the trench, and an inspection was not conducted for these conditions by a competent person in trenching and excavations. In addition, soil classification was not conducted, work was being conducted outside of the trench shielding method, and the shielding in use was not firmly braced up against the side walls of the trench. Workers were installing a sewer line at a residence. NOTE: Abatement certification and documentation are required for this item.
Citation ID 01002C
Citaton Type Serious
Standard Cited 19260652 A01
Issuance Date 2017-05-17
Abatement Due Date 2017-07-05
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2017-06-28
Nr Instances 2
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.652(a)(1): Each employee in an excavation shall be protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section. a) On or about May 10, 2017 or prior thereto: Cave-in hazards were present on a 9 foot deep rectangular trench with vertical walls on the east and west side of the trench during the installation of a residential sewer line. The trench was 8 foot wide by 10 feet long. Workers were located outside of the protective shielding in use while working in the trench. b) On or about May 10, 2017 or prior thereto: Cave-in hazards were present on a 9 foot deep rectangular trench with vertical walls on the north and south side of the trench during the installation of a residential sewer line. The trench was 8 foot wide by 10 feet long. No shielding was in place on the north and south walls of the trench opposite of the trench shield in use. NOTE: Abatement certification and documentation are required for this item.
Citation ID 01002D
Citaton Type Serious
Standard Cited 19260652 C02 III
Issuance Date 2017-05-17
Abatement Due Date 2017-07-05
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2017-06-28
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.652(c)(2)(iii): Manufacturer's specifications, recommendations, and limitations, and manufacturer's approval to deviate from the specifications, recommendations, and limitations were not in written form at the jobsite during construction of the protective system, nor was a copy made available to the Secretary upon request. a) On or about May 10, 2017 or prior thereto: Manufacturer's specifications and tabulated data for the wood shielding and hydraulic jack system utilized by the employer to protect employees in a 9 foot deep trench were not available to OSHA when requested. NOTE: Abatement certification and documentation are required for this item.
Citation ID 01002E
Citaton Type Serious
Standard Cited 19260652 G01 II
Issuance Date 2017-05-17
Abatement Due Date 2017-07-05
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2017-06-28
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.652(g)(1)(ii): Shields were not installed in a manner to restrict lateral or other hazardous movement of the shield in the event of the application of sudden lateral loads. a) On or about May 10, 2017 or prior thereto: The trench shield utilized by the employer in a 9 foot deep trench was not firmly abutted against the east and west sides of the trench during employee exposure. NOTE: Abatement certification and documentation are required for this item.

Date of last update: 14 Apr 2025