Name: | EXTERIOR SOLUTIONS STUCCO & STONE LLC |
Jurisdiction: | Idaho |
Legal type: | Limited Liability Company (D) |
Status: | Inactive-Dissolved |
Date of registration: | 06 Oct 2011 (14 years ago) |
Financial Date End: | 31 Oct 2014 |
Date dissolved: | 14 Apr 2014 |
Entity Number: | 330885 |
Place of Formation: | IDAHO |
File Number: | 0000330885 |
ZIP code: | 83705 |
County: | Ada County |
Principal Address: | 3555 CHILE ST BOISE, ID 83705 |
Filing Name | Filing Number | Filing date |
---|---|---|
Statement of Dissolution | 0000858634 | 2014-04-14 |
Application for Reinstatement | 0002396704 | 2013-02-08 |
Application for Reinstatement | 0000858635 | 2013-02-05 |
Initial Filing | 0000330885 | 2011-10-06 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
334619467 | 1032500 | 2012-06-07 | E. MILL STATION DRIVE, BOISE, ID, 83716 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 461947 |
Safety | Yes |
Type | Inspection |
Activity Nr | 461948 |
Safety | Yes |
Type | Inspection |
Activity Nr | 519715 |
Safety | Yes |
Type | Inspection |
Activity Nr | 519714 |
Safety | Yes |
Type | Inspection |
Activity Nr | 519713 |
Safety | Yes |
Type | Inspection |
Activity Nr | 461944 |
Safety | Yes |
Type | Inspection |
Activity Nr | 460614 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2012-07-25 |
Current Penalty | 750.0 |
Initial Penalty | 1156.0 |
Final Order | 2012-08-10 |
Nr Instances | 1 |
Nr Exposed | 3 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) South, west and north sides of the 1st and 2nd levels; On or about June 6, 2012 and at times prior thereto, employees installing lathe and prepping for stucco were working on 3 foot wide tubular welded frame scaffold that had sections that were not fully planked. Only two planks were used in lieu of the three that were needed. Note: Abatement certification is Not required for this item. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260451 B03 II |
Issuance Date | 2012-07-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2012-08-10 |
Nr Instances | 1 |
Nr Exposed | 3 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(3)(ii): The maximum distance from the face for plastering and lathing operations exceeded18 inches (46 cm). a) South, west and north sides of the 1st and 2nd levels; On or about June 6, 2012 and at times prior thereto, employees installing lathe and prepping for stucco were working on 3 foot wide tubular welded frame scaffold that had sections where the platform ranged up to 28 inches away from the face of the structure. Note: Abatement certification is NOT required for this item. |
Citation ID | 01001C |
Citaton Type | Serious |
Standard Cited | 19260451 G04 |
Issuance Date | 2012-07-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2012-08-10 |
Nr Instances | 1 |
Nr Exposed | 3 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(4): Guardrail systems installed to meet the requirements of this section did not comply with the provisions listed in subparagraphs (i) through (xv) of this paragraph. a) South, west and north sides of the 2nd level; On or about June 6, 2012 and at times prior thereto, employees installing lathe and prepping for stucco were working on 3 foot wide tubular welded frame scaffold that had sections where the top rail or mid rail were missing. Note: Abatement certification is NOT required for this item. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260451 C02 |
Issuance Date | 2012-07-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2012-08-10 |
Nr Instances | 1 |
Nr Exposed | 3 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a) South, west and north sides of the 1st level; On or about June 6, 2012 and at times prior thereto, employees installing lathe and prepping for stucco were working on 3 foot wide tubular welded frame scaffold that had inadequate or missing mud sills. Note: Abatement certification is NOT required for this item. |
Date of last update: 24 Sep 2024
Sources: Idaho Secretary of State