Search icon

BLACK EAGLE CONSTRUCTION LLC

Company Details

Name: BLACK EAGLE CONSTRUCTION LLC
Jurisdiction: Idaho
Legal type: Limited Liability Company (D)
Status: Active-Existing
Date of registration: 01 Jul 2011 (14 years ago)
Financial Date End: 31 Jul 2025
Entity Number: 323158
Place of Formation: IDAHO
File Number: 323158
Principal Address: PO BOX 562 MERIDIAN, ID 83680
Mailing Address: PO BOX 562 MERIDIAN, ID 83680-0562

form 5500

Plan Name Plan Year EIN/PN Received Sponsor Total number of participants
BLACK EAGLE CONSTRUCTION, LLC 401(K) PLAN 2023 452666481 2024-07-22 BLACK EAGLE CONSTRUCTION, LLC 20
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2022-01-01
Business code 238100
Sponsor’s telephone number 2088908750
Plan sponsor’s address 1317 E. COMMERIAL DR. #100, MERIDIAN, ID, 83642

Signature of

Role Plan administrator
Date 2024-07-22
Name of individual signing CHRISTINE MOE
Valid signature Filed with authorized/valid electronic signature
BLACK EAGLE CONSTRUCTION, LLC 401(K) PLAN 2022 452666481 2023-05-04 BLACK EAGLE CONSTRUCTION, LLC 17
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2022-01-01
Business code 238100
Sponsor’s telephone number 2088908750
Plan sponsor’s address 1317 E. COMMERIAL DR. #100, MERIDIAN, ID, 83642

Signature of

Role Plan administrator
Date 2023-05-04
Name of individual signing CHRISTINE MOE
Valid signature Filed with authorized/valid electronic signature

Agent

Name Role Address
DARRIN J MOE Agent 4627 N HARTLEY, EAGLE, ID 83616

Member

Name Role Address Appointed On
Darrin J Moe Member 4627 W. HARTEY RD, EAGLE, ID 83616 2021-06-09

Filing

Filing Name Filing Number Filing date
Annual Report 0005757131 2024-06-03
Annual Report 0005272018 2023-06-07
Annual Report 0004767315 2022-06-03
Annual Report 0004311141 2021-06-09
Annual Report 0003889734 2020-06-03
Annual Report 0003539939 2019-06-17
Annual Report 0002355773 2018-05-31
Annual Report 0002355772 2017-05-19
Change of Registered Office/Agent/Both (by Entity) 0002355771 2016-07-25
Legacy Amendment 0000855296 2016-07-05

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
344665310 1032500 2020-03-02 1050 AMITY ROAD, MERIDIAN, ID, 83646
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2020-03-02
Emphasis N: TRENCH
Case Closed 2021-08-24

Related Activity

Type Complaint
Activity Nr 1548857
Safety Yes
Type Inspection
Activity Nr 1466810
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260021 B02
Issuance Date 2020-03-27
Abatement Due Date 2020-03-30
Current Penalty 4500.0
Initial Penalty 6748.0
Final Order 2020-04-21
Nr Instances 1
Nr Exposed 3
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to the work environment to control or eliminate any hazards or other exposure to illness or injury: a) Jobsite, excavation #1: On March 2, 2020 and at times prior thereto a clear path of egress was not maintained for employees working in an excavation. Employees did not recognize or acknowledge the hazard of not having safe egress out of the trench or take action to correct the hazard. b) Jobsite, excavation #1: On March 2, 2020 and at times prior thereto excavated materials and construction materials were not removed from or placed away from the excavation. Employees did not recognize or acknowledge the hazard and take action to minimize the hazard. c) Jobsite, excavation #1: On March 2, 2020 and at times prior thereto employees worked above uncapped rebar stakes. Employees did not recognize or acknowledge the hazard and take action to minimize the hazard. e) Jobsite, excavation #3: On or about March 2, 2020 and at times prior thereto employees worked in an excavation without a cave-in protective system in place. The excavation was 6.4 to 7.4 feet deep with vertical walls. Employees did not recognize or acknowledge the hazards of working in close proximity to an unsupported excavated wall, or the actions needed to minimize or control the hazard. Note) Certification of corrective actions are required for these items.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260651 K01
Issuance Date 2020-03-27
Abatement Due Date 2020-03-30
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2020-04-21
Nr Instances 1
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems was not made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection was not conducted by the competent person prior to the start of work and as needed throughout the shift: a) Jobsite, excavation #1: On March 2, 2020 and at times prior thereto a competent person was not on site who could identify hazardous conditions in an excavation. A clear path or other safe means of egress was not maintained for employees working in an excavation. b) Jobsite, excavation #1: On March 2, 2020 and at times prior thereto a competent person was not on site who could identify hazardous conditions in an excavation. Excavated materials and construction materials and that could roll or slide into the excavation were not removed or placed away from the excavation. c) Jobsite, excavation #1: On March 2, 2020 and at times prior thereto a competent person was not on site who could identify hazardous conditions in an excavation. Employees in the excavation worked above uncapped rebar stakes. d) Jobsite, excavation #3: On or about March 2, 2020 and at times prior thereto a competent person was not on site who could identify hazardous conditions in an excavation. Appropriate actions were not taken to correct or minimize hazards as the conditions of the excavation changed. Employees worked in areas that were 6.4 to 7.4 feet deep, with 5 to 5.5 feet between unsupported excavated walls and the wooden concrete forms the employees were building. Note) The competent person definition applicable to this subpart means one who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them. Note) Certification of corrective actions are required for these items.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260651 C02
Issuance Date 2020-03-27
Abatement Due Date 2020-03-30
Current Penalty 2700.0
Initial Penalty 4048.0
Final Order 2020-04-21
Nr Instances 1
Nr Exposed 2
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: a) Excavation #1: On March 2, 2020 and at times prior thereto a clear path of egress was not maintained for employees working in an excavation. Employees had to climb on loose soil and rocks to get in and out of the excavation. Note) Certification of corrective action is required for this item.
Citation ID 01003A
Citaton Type Serious
Standard Cited 19260651 J02
Issuance Date 2020-03-27
Abatement Due Date 2020-03-30
Current Penalty 4500.0
Initial Penalty 6747.0
Final Order 2020-04-21
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(j)(2): Employees were not protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations: a) Excavation #1: On March 2, 2020 and at times prior thereto employees worked in an excavation with a 40 degree sloped wall. Excavated materials and construction materials were not removed from or placed away from the top of the excavation so as not to pose a potential hazard of rolling or sliding into the excavation. Note) Certification of corrective action is required for this item.
Citation ID 01003B
Citaton Type Serious
Standard Cited 19260652 A01
Issuance Date 2020-03-27
Abatement Due Date 2020-03-30
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2020-04-21
Nr Instances 1
Nr Exposed 3
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c) of this section: a) Excavation #3: On or before March 3, 2020 employees worked in a 6.4 to 7.4 foot deep excavation to build a concrete irrigation box. The space between the near vertical excavated walls and the wooden forms was 5.5 feet. A cave-in protective system was not in place Note) Certification of corrective action is required for this item.
Citation ID 01004
Citaton Type Other
Standard Cited 19260701 B
Issuance Date 2020-03-27
Abatement Due Date 2020-03-30
Current Penalty 0.0
Initial Penalty 5397.0
Final Order 2020-04-21
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.701(b): All protruding reinforcing steel, onto which employees could fall, was not guarded to eliminate the hazard of impalement: a) Jobsite: On March 2, 2020 and at times prior thereto employees were exposed to an impalement hazard from uncapped rebar. Employees worked directly above the uncapped rebar while installing metal clips on a wooden concrete form they were building. Note) Certification of corrective action is require for this item.
Citation ID 02001
Citaton Type Other
Standard Cited 19260150 A02
Issuance Date 2020-03-27
Abatement Due Date 2020-03-30
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2020-04-21
Nr Instances 1
Nr Exposed 3
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.150(a)(2): Access to all available firefighting equipment was not maintained at all times: a) Jobsite: On March 2, 2020 and at times prior thereto a portable gas powered generator with at least two additional gas cans were used by the employees. A portable fire extinguisher was not available for employee use if needed. Note) Certification of corrective action is required for this item.

Paycheck Protection Program

Loan Number Loan Funded Date SBA Origination Office Code Loan Delivery Method Borrower Street Address
3761708204 2020-08-05 1087 PPP 1317 East Commercial Drive Suite 100, Meridian, ID, 83642-4077
Loan Status Date 2021-08-14
Loan Status Paid in Full
Loan Maturity in Months 60
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 367265
Loan Approval Amount (current) 367265
Undisbursed Amount 0
Franchise Name -
Lender Location ID 529111
Servicing Lender Name FC Marketplace, LLC (dba Funding Circle)
Servicing Lender Address 85 2nd Street, Floor 4, San Francisco, CA, 94105
Rural or Urban Indicator U
Hubzone Y
LMI Y
Business Age Description Unanswered
Project Address Meridian, ADA, ID, 83642-4077
Project Congressional District ID-01
Number of Employees 28
NAICS code 236220
Borrower Race Unanswered
Borrower Ethnicity Unknown/NotStated
Business Type Limited Liability Company(LLC)
Originating Lender ID 529111
Originating Lender Name FC Marketplace, LLC (dba Funding Circle)
Originating Lender Address San Francisco, CA
Gender Unanswered
Veteran Unanswered
Forgiveness Amount 370703.01
Forgiveness Paid Date 2021-07-19

Date of last update: 04 Apr 2025

Sources: Idaho Secretary of State