Name: | SUPERIOR CONSTRUCTION & EXCAVATING, INC. |
Jurisdiction: | Idaho |
Legal type: | General Business Corporation (D) |
Status: | Active-Good Standing |
Date of registration: | 22 Jan 1993 (32 years ago) |
Financial Date End: | 31 Jan 2025 |
Entity Number: | 311804 |
Place of Formation: | IDAHO |
File Number: | 311804 |
Mailing Address: | PO BOX 455 MERIDIAN, ID 83680-0455 |
Plan Name | Plan Year | EIN/PN | Received | Sponsor | Total number of participants | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SUPERIOR CONSTRUCTION 401(K) PLAN | 2023 | 820457177 | 2024-05-20 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 58 | |||||||||||||
|
||||||||||||||||||
SUPERIOR CONSTRUCTION 401(K) PLAN | 2022 | 820457177 | 2023-04-24 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 54 | |||||||||||||
|
||||||||||||||||||
SUPERIOR CONSTRUCTION 401(K) PLAN | 2021 | 820457177 | 2022-03-22 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 51 | |||||||||||||
|
||||||||||||||||||
SUPERIOR CONSTRUCTION 401(K) PLAN | 2020 | 820457177 | 2021-02-17 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 49 | |||||||||||||
|
||||||||||||||||||
SUPERIOR CONSTRUCTION 401(K) PLAN | 2019 | 820457177 | 2020-06-23 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 43 | |||||||||||||
|
||||||||||||||||||
SUPERIOR CONSTRUCTION 401(K) PLAN | 2018 | 820457177 | 2019-04-17 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 31 | |||||||||||||
|
||||||||||||||||||
SUPERIOR CONSTRUCTION 401(K) PLAN | 2017 | 820457177 | 2018-03-19 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 31 | |||||||||||||
|
||||||||||||||||||
SUPERIOR CONSTRUCTION 401(K) PLAN | 2016 | 820457177 | 2017-09-20 | SUPERIOR CONSTRUCTION & EXCAVATING, INC. | 26 | |||||||||||||
|
Name | Role | Address |
---|---|---|
MARK S FREEMAN | Agent | 953 S INDUSTRY WAY, MERIDIAN, ID 83642 |
Name | Role | Address | Appointed On |
---|---|---|---|
Kelly Fulfer | President | 2350 W MCMILLAN RD, MERIDIAN, ID 83646 | 2020-12-03 |
Name | Role | Address | Appointed On |
---|---|---|---|
Jerry Lee | Secretary | 9178 W. STONEWOOD DR, BOISE, ID 83709 | 2024-01-09 |
Name | Role | Address | Appointed On |
---|---|---|---|
Brenda Fulfer | Vice President | 2350 W. MCMILLAN RD, MERIDIAN, ID 83646 | 2024-01-09 |
Filing Name | Filing Number | Filing date |
---|---|---|
Annual Report | 0005552348 | 2024-01-09 |
Annual Report | 0005033491 | 2022-12-19 |
Annual Report | 0004517525 | 2021-12-06 |
Annual Report | 0004082991 | 2020-12-03 |
Annual Report | 0003696430 | 2019-12-03 |
Annual Report | 0003427996 | 2019-02-12 |
Annual Report | 0002294500 | 2017-11-30 |
Annual Report | 0002294498 | 2017-01-05 |
Annual Report | 0002294496 | 2015-11-16 |
Annual Report | 0002294494 | 2014-12-02 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Superior Construction-10 mile pit | Surface | Abandoned | Construction Sand and Gravel | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Quality Sand & Gravel |
Role | Operator |
Start Date | 2000-05-01 |
End Date | 2012-07-31 |
Name | Superior Construction & Excavating Inc. |
Role | Operator |
Start Date | 2012-08-01 |
Name | Kelly Fulfer |
Role | Current Controller |
Start Date | 2012-08-01 |
Name | Superior Construction & Excavating Inc. |
Role | Current Operator |
Accidents
Accident Date | 2003-03-11 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by flying object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | EE WAS CLEARING ROCKS OUT OF A PLUGGED TRANSFER POINT ON THE CONVEYOR. AFTER IT WAS CLEARED, HE STEPPED AWAY FROM THE BELT. THE OPERATOR STARTED THE BELT AND A ROCK THAT WAS CAUGHT BETWEEN THE METAL BELT GUARD AND THE ROLLER KICKED OUT AND HIT EE ON THE BRIDGE OF HIS NOSE. |
Accident Date | 2002-03-29 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Caught in, under or between NEC |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | HE GOT A PINCHED FINGER WITH 6 STITCHES AT THE NAIL. |
Inspections
Start Date | 2008-12-30 |
End Date | 2008-12-30 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2008-06-30 |
End Date | 2008-06-30 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 1.5 |
Start Date | 2008-06-17 |
End Date | 2008-06-17 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2008-06-09 |
End Date | 2008-06-11 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 19.5 |
Start Date | 2008-01-03 |
End Date | 2008-01-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 22 |
Start Date | 2007-02-28 |
End Date | 2007-03-02 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 16 |
Start Date | 2006-01-24 |
End Date | 2006-01-24 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 3.25 |
Start Date | 2005-12-27 |
End Date | 2005-12-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2005-09-22 |
End Date | 2005-09-22 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 1 |
Total Hours | 6 |
Start Date | 2005-05-10 |
End Date | 2005-05-11 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 11 |
Start Date | 2004-12-02 |
End Date | 2004-12-03 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2004-09-09 |
End Date | 2004-09-21 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 22 |
Start Date | 2004-01-21 |
End Date | 2004-01-21 |
Activity | PART 50 AUDIT |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2004-01-16 |
End Date | 2004-01-21 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 26 |
Start Date | 2003-12-30 |
End Date | 2003-12-30 |
Activity | MISCELLANEOUS INSPECTION/INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 6 |
Start Date | 2003-01-07 |
End Date | 2003-01-08 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 22 |
Start Date | 2002-03-07 |
End Date | 2002-03-07 |
Activity | COMPLIANCE FOLLOW-UP INSPECTION |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2002-01-10 |
End Date | 2002-01-10 |
Activity | COMPLIANCE FOLLOW-UP INSPECTION |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2001-12-14 |
End Date | 2001-12-18 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 24 |
Start Date | 2001-05-30 |
End Date | 2001-05-30 |
Activity | COMPLIANCE FOLLOW-UP INSPECTION |
Number Inspectors | 1 |
Total Hours | 6 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2008 |
Annual Hours | 10785 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 1798 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2008 |
Annual Hours | 4448 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2224 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2007 |
Annual Hours | 25212 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 2101 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2007 |
Annual Hours | 8517 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2129 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2006 |
Annual Hours | 26167 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 2181 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2006 |
Annual Hours | 9429 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1886 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2005 |
Annual Hours | 16514 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 2064 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2005 |
Annual Hours | 6650 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 2217 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2004 |
Annual Hours | 17442 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 2492 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2004 |
Annual Hours | 6150 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1538 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2003 |
Annual Hours | 10837 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2167 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2003 |
Annual Hours | 4682 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2341 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2002 |
Annual Hours | 14427 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 2405 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2002 |
Annual Hours | 5106 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1702 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2001 |
Annual Hours | 15263 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 2180 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2001 |
Annual Hours | 4565 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1522 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2000 |
Annual Hours | 5549 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1110 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2000 |
Annual Hours | 2050 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 683 |
Directions to Mine | Portable |
Parties
Name | Quality Sand & Gravel |
Role | Operator |
Start Date | 2007-10-05 |
End Date | 2012-08-30 |
Name | Superior Construction & Excavating Inc. |
Role | Operator |
Start Date | 2012-08-31 |
Name | Kelly Fulfer |
Role | Current Controller |
Start Date | 2012-08-31 |
Name | Superior Construction & Excavating Inc. |
Role | Current Operator |
Accidents
Accident Date | 2024-04-26 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by... NEC |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | While lifting the feeder conveyor to lower the leg chain slipped due to improper chaining. Conveyor struck employee in head causing a head laceration and a fractured vertebra in neck. We no longer use chains to lift equipment. We have purchased straps. |
Accident Date | 2021-02-15 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | WAS SHOVELING SNOW LEFT SHOULDER POPPED OUT. PRE-EXISTING CONDITION. |
Inspections
Start Date | 2024-10-07 |
End Date | 2024-10-07 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 1.75 |
Start Date | 2024-10-01 |
End Date | 2024-10-01 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 4.75 |
Start Date | 2024-07-02 |
End Date | 2024-07-02 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7 |
Start Date | 2023-12-28 |
End Date | 2023-12-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 6.75 |
Start Date | 2023-08-09 |
End Date | 2023-08-09 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 1 |
Start Date | 2023-08-09 |
End Date | 2023-08-09 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 5.5 |
Start Date | 2023-02-22 |
End Date | 2023-02-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7.75 |
Start Date | 2022-04-25 |
End Date | 2022-04-25 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 1.75 |
Start Date | 2022-04-12 |
End Date | 2022-04-15 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2021-11-10 |
End Date | 2021-11-10 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7.75 |
Start Date | 2021-05-04 |
End Date | 2021-05-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7.25 |
Start Date | 2021-01-11 |
End Date | 2021-01-11 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 2.5 |
Start Date | 2021-01-07 |
End Date | 2021-01-07 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7.25 |
Start Date | 2020-05-26 |
End Date | 2020-05-27 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 14.75 |
Start Date | 2020-01-03 |
End Date | 2020-01-03 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8.25 |
Start Date | 2019-09-26 |
End Date | 2019-09-26 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 2.5 |
Start Date | 2019-08-21 |
End Date | 2019-08-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 11 |
Start Date | 2019-03-18 |
End Date | 2019-03-19 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 13 |
Start Date | 2018-06-07 |
End Date | 2018-06-07 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 3.75 |
Start Date | 2018-05-30 |
End Date | 2018-05-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 15.25 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2024 |
Annual Hours | 11106 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2221 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2024 |
Annual Hours | 2400 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2400 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2023 |
Annual Hours | 10617 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2123 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2023 |
Annual Hours | 2400 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2400 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2022 |
Annual Hours | 11842 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 1974 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2022 |
Annual Hours | 2400 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2400 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2021 |
Annual Hours | 14408 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 2401 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2021 |
Annual Hours | 2400 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2400 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2020 |
Annual Hours | 14184 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 2364 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2020 |
Annual Hours | 2420 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2420 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2019 |
Annual Hours | 12222 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2444 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2019 |
Annual Hours | 2509 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1255 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2018 |
Annual Hours | 11451 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2290 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2018 |
Annual Hours | 2978 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1489 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2017 |
Annual Hours | 9430 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1886 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2017 |
Annual Hours | 2251 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2251 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2016 |
Annual Hours | 7471 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1868 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2016 |
Annual Hours | 2552 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2552 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2015 |
Annual Hours | 9377 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2344 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2015 |
Annual Hours | 2221 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2221 |
Directions to Mine | Portable-Various Locations |
Parties
Name | Superior Construction & Excavating Inc. |
Role | Operator |
Start Date | 2016-01-14 |
Name | Kelly Fulfer |
Role | Current Controller |
Start Date | 2016-01-14 |
Name | Superior Construction & Excavating Inc. |
Role | Current Operator |
Inspections
Start Date | 2017-02-15 |
End Date | 2017-02-16 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7.5 |
Start Date | 2016-09-19 |
End Date | 2016-09-19 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2016-08-15 |
End Date | 2016-08-15 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 1.75 |
Start Date | 2016-07-25 |
End Date | 2016-07-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 18.5 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2018 |
Annual Hours | 240 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 120 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2017 |
Annual Hours | 2549 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 637 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2016 |
Annual Hours | 4597 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1532 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
343881447 | 1032500 | 2019-03-26 | S OF OVERLAND, BOISE, ID, 83709 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1439614 |
Safety | Yes |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2010-03-24 |
Emphasis | S: STRUCK-BY, S: TRENCHING, S: RESIDENTIAL CONSTR, S: POWERED IND VEHICLE, S: HWY STREET BRIDGE CONSTR, N: TRENCH |
Case Closed | 2010-03-25 |
Related Activity
Type | Referral |
Activity Nr | 200249662 |
Safety | Yes |
Inspection Type | Referral |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2008-03-31 |
Emphasis | S: TRENCHING, S: POWERED IND VEHICLE, S: COMMERCIAL CONSTR, N: TRENCH |
Case Closed | 2008-06-20 |
Related Activity
Type | Referral |
Activity Nr | 200246528 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260651 K01 |
Issuance Date | 2008-04-01 |
Abatement Due Date | 2008-05-29 |
Current Penalty | 900.0 |
Initial Penalty | 1500.0 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 03 |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260652 A01 |
Issuance Date | 2008-04-01 |
Abatement Due Date | 2008-04-07 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 03 |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260651 J02 |
Issuance Date | 2008-04-01 |
Abatement Due Date | 2008-04-08 |
Current Penalty | 500.0 |
Initial Penalty | 900.0 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 01 |
Inspection Type | Complaint |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2006-08-31 |
Emphasis | N: TRENCH |
Case Closed | 2006-09-26 |
Related Activity
Type | Complaint |
Activity Nr | 200242659 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Other |
Standard Cited | 19261053 B01 |
Issuance Date | 2006-09-01 |
Abatement Due Date | 2006-09-28 |
Nr Instances | 1 |
Nr Exposed | 3 |
Related Event Code (REC) | Complaint |
Gravity | 01 |
Inspection Type | Complaint |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2003-02-24 |
Emphasis | N: TRENCH |
Case Closed | 2003-03-18 |
Related Activity
Type | Complaint |
Activity Nr | 200232411 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Other |
Standard Cited | 19260652 C03 I |
Issuance Date | 2003-03-04 |
Abatement Due Date | 2003-03-10 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 01 |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2003-02-20 |
Emphasis | N: TRENCH |
Case Closed | 2003-05-05 |
Related Activity
Type | Referral |
Activity Nr | 200237808 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260651 C02 |
Issuance Date | 2003-02-21 |
Abatement Due Date | 2003-02-27 |
Current Penalty | 1300.0 |
Initial Penalty | 2500.0 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260652 A01 |
Issuance Date | 2003-02-21 |
Abatement Due Date | 2003-02-27 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2002-11-07 |
Emphasis | S: CONSTRUCTION |
Case Closed | 2002-11-08 |
Related Activity
Type | Referral |
Activity Nr | 200237287 |
Safety | Yes |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2001-09-27 |
Emphasis | N: TRENCH, S: CONSTRUCTION |
Case Closed | 2001-09-27 |
Related Activity
Type | Referral |
Activity Nr | 902588482 |
Safety | Yes |
Inspection Type | Complaint |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2001-04-20 |
Emphasis | N: TRENCH |
Case Closed | 2001-04-20 |
Related Activity
Type | Complaint |
Activity Nr | 76988070 |
Safety | Yes |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 1999-04-27 |
Emphasis | N: TRENCH |
Case Closed | 1999-07-27 |
Related Activity
Type | Referral |
Activity Nr | 200232932 |
Safety | Yes |
Inspection Type | Complaint |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1993-03-05 |
Emphasis | N: TRENCH |
Case Closed | 1993-05-25 |
Related Activity
Type | Complaint |
Activity Nr | 74692815 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Other |
Standard Cited | 19260651 J02 |
Issuance Date | 1993-05-03 |
Abatement Due Date | 1993-05-07 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 01 |
Date of last update: 04 Apr 2025
Sources: Idaho Secretary of State