YOUNG CONSTRUCTION GROUP OF IDAHO, INC.

Company Details

Name: YOUNG CONSTRUCTION GROUP OF IDAHO, INC.
Jurisdiction: Idaho
Legal type: General Business Corporation (D)
Status: Active-Good Standing
Date of registration: 30 Mar 1987 (38 years ago)
Financial Date End: 31 Mar 2026
Entity Number: 260482
Place of Formation: IDAHO
File Number: 260482
Mailing Address: PO BOX 3701 COEUR D ALENE, ID 83816-2529

Agent

Name Role Address
PAUL W DAUGHARTY Agent 110 E WALLACE AVE, COEUR D'ALENE, ID 83814

President

Name Role Address Appointed On
Karl J Young President 2051 WOODSTONE DR., HAYDEN, ID 83835 2021-02-17

Filing

Filing Name Filing Number Filing date
Annual Report 0006094969 2025-02-04
Annual Report 0005610932 2024-02-22
Annual Report 0005117981 2023-02-16
Annual Report 0004618927 2022-02-21
Annual Report 0004176238 2021-02-17
Annual Report 0003761120 2020-02-03
Annual Report 0003457304 2019-03-19
Annual Report 0002003146 2018-02-16
Annual Report 0002003145 2017-01-31
Annual Report 0002003144 2016-02-12

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
347420853 1032500 2024-04-02 497 S BECK RD, POST FALLS, ID, 83854
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2024-04-02
Emphasis N: CTARGET, P: CTARGET
Case Closed 2024-04-05
345729487 1032500 2022-01-13 4041 E. PRIMROSE, POST FALLS, ID, 83854
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2022-01-13
Emphasis P: IDCON, L: IDCON
Case Closed 2022-01-13
345196026 1032500 2021-03-11 13590 N GOVERNMENT WAY, HAYDEN, ID, 83835
Inspection Type Planned
Scope NoInspection
Safety/Health Safety
Close Conference 2021-03-11
Emphasis P: CTARGET, N: CTARGET
Case Closed 2021-03-11
345195994 1032500 2021-03-11 13782 NORTH GOVERNMENT WAY, HAYDEN, ID, 83835
Inspection Type Planned
Scope NoInspection
Safety/Health Safety
Close Conference 2021-03-11
Emphasis N: CTARGET, P: CTARGET
Case Closed 2021-03-11
345196133 1032500 2021-03-11 708 N DIVISION STREET, PINEHURST, ID, 83850
Inspection Type Planned
Scope NoInspection
Safety/Health Safety
Close Conference 2021-03-11
Emphasis N: CTARGET, P: CTARGET
Case Closed 2021-03-11
343915880 1032500 2019-04-05 1593 EAST POLSTON AVE, POST FALLS, ID, 83854
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2019-04-05
Emphasis N: CTARGET, P: CTARGET
Case Closed 2019-09-26

Related Activity

Type Inspection
Activity Nr 1391614
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Other
Standard Cited 19260020 B02
Issuance Date 2019-04-22
Abatement Due Date 2019-05-02
Current Penalty 2319.0
Initial Penalty 2319.0
Final Order 2019-05-08
Nr Instances 1
Nr Exposed 2
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment: a) Jobsite: On April 5, 2019 and at times prior thereto site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify sub-contractor employees exposed to unserviceable equipment. A chop saw was used with the blade guard catcher missing and the blade guard pinned back. b) Jobsite: On April 5, 2019 and at times prior thereto site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify a temporary propane tank that was not adequately protected from vehicular traffic within the jobsite. Note) Certification of corrective actions are required for these items.
Citation ID 01001B
Citaton Type Other
Standard Cited 19260300 A
Issuance Date 2019-04-22
Abatement Due Date 2019-05-02
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2019-05-08
Nr Instances 1
Nr Exposed 2
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.300(a): Hand tool(s), power tool(s) or similar equipment were not maintained in a safe condition: a) Jobsite: On April 5, 2019 and at times prior thereto site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify sub-contractor employees exposed to unserviceable equipment. A Dewalt chop saw blade guard catcher was missing and the guard was pinned back. Sub-contractor employees used the chop saw to cut metal framing. Note) Certification of corrective action is required for this item.
Citation ID 01001C
Citaton Type Other
Standard Cited 19260300 B01
Issuance Date 2019-04-22
Abatement Due Date 2019-05-02
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2019-05-08
Nr Instances 1
Nr Exposed 2
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use: a) Jobsite: On April 5, 2019 and at times prior thereto the site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify sub-contractor employees exposed to unserviceable equipment. A Dewalt chop saw blade guard was not used. The blade guard catcher was missing and the blade guard was pinned back. The sub-contractor employees used the chop saw to cut metal framing. Note) Certification of corrective action is required for this item.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260153 O
Issuance Date 2019-04-22
Abatement Due Date 2019-05-02
Current Penalty 1739.0
Initial Penalty 1739.0
Final Order 2019-05-08
Nr Instances 1
Nr Exposed 6
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.153(o): When damage to LP-Gas systems from vehicular traffic was a possibility, precautions against such damage were not taken: a) Jobsite: On April 5, 2019 and at times prior thereto a temporary propane tank was not adequately protected from vehicular traffic within the jobsite. A wooden railing positioned on two sides of the tank had been struck and was laying in pieces near the tank. Note) Certification of corrective action is required for this item.
343915773 1032500 2019-04-05 2290 WEST PRAIRIE AVE, COEUR D ALENE, ID, 83815
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2019-04-05
Emphasis N: CTARGET, P: CTARGET
Case Closed 2019-04-05
343472973 1032500 2018-09-19 CHILDREN'S VILLAGE 6350 N CHILDREN'S VILLAGE CT, COEUR D ALENE, ID, 83815
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2018-09-19
Emphasis L: IDCON, P: IDCON
Case Closed 2018-10-03
343344115 1032500 2018-07-26 1916 CHARLEVILLE, POST FALLS, ID, 83854
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2018-07-26
Case Closed 2019-11-29

Related Activity

Type Referral
Activity Nr 1365316
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260760 A01
Issuance Date 2018-10-29
Abatement Due Date 2018-11-26
Current Penalty 0.0
Initial Penalty 5174.0
Final Order 2018-11-26
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.760(a)(1): Except as provided by paragraph (a)(3) of this section, each employee engaged in a steel erection activity who was on a walking/working surface with an unprotected side or edge more than 15 feet* (4.6m) above a lower level was not protected from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, positioning device systems or fall restraint systems: (a) Real Life Ministries Field House: On or about July 26, 2018, and at times prior thereto, the controlling contractor Young Construction Group of Idaho, Inc. did not ensure that its sub-contracted employer B.F. Builders, Inc. protected its employees with a means of fall protection while installing the OptiLiner Banded Liner system, which exposed them to the hazard of falling approximately 30 feet ground to eave. Note: Abatement Certification and Documentation ARE required.
342206075 1032500 2017-03-23 1604 EAST SELTICE WAY, POST FALLS, ID, 83854
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2017-03-23
Case Closed 2017-03-29

Related Activity

Type Complaint
Activity Nr 1193928
Safety Yes
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2015-05-07
Emphasis L: IDCON, P: IDCON
Case Closed 2015-06-10

Related Activity

Type Inspection
Activity Nr 1062406
Safety Yes

Paycheck Protection Program

Loan Number Loan Funded Date SBA Origination Office Code Loan Delivery Method Borrower Street Address
7247827008 2020-04-07 1094 PPP PO Box 3701, COEUR D ALENE, ID, 83816-2529
Loan Status Date 2021-01-20
Loan Status Paid in Full
Loan Maturity in Months 24
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 515800
Loan Approval Amount (current) 515800
Undisbursed Amount 0
Franchise Name -
Lender Location ID 74899
Servicing Lender Name Washington Trust Bank
Servicing Lender Address 717 W Sprague Ave, SPOKANE, WA, 99201-3915
Rural or Urban Indicator U
Hubzone N
LMI N
Business Age Description Unanswered
Project Address COEUR D ALENE, KOOTENAI, ID, 83816-2529
Project Congressional District ID-01
Number of Employees 26
NAICS code 236220
Borrower Race White
Borrower Ethnicity Not Hispanic or Latino
Business Type Corporation
Originating Lender ID 74899
Originating Lender Name Washington Trust Bank
Originating Lender Address SPOKANE, WA
Gender Male Owned
Veteran Non-Veteran
Forgiveness Amount 519332.88
Forgiveness Paid Date 2020-12-23

Date of last update: 10 Mar 2025

Sources: Idaho Secretary of State