347420853
|
1032500
|
2024-04-02
|
497 S BECK RD, POST FALLS, ID, 83854
|
|
Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2024-04-02
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2024-04-05
|
|
345729487
|
1032500
|
2022-01-13
|
4041 E. PRIMROSE, POST FALLS, ID, 83854
|
|
Inspection Type |
Planned
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2022-01-13
|
Emphasis |
P: IDCON, L: IDCON
|
Case Closed |
2022-01-13
|
|
345196026
|
1032500
|
2021-03-11
|
13590 N GOVERNMENT WAY, HAYDEN, ID, 83835
|
|
Inspection Type |
Planned
|
Scope |
NoInspection
|
Safety/Health |
Safety
|
Close Conference |
2021-03-11
|
Emphasis |
P: CTARGET, N: CTARGET
|
Case Closed |
2021-03-11
|
|
345195994
|
1032500
|
2021-03-11
|
13782 NORTH GOVERNMENT WAY, HAYDEN, ID, 83835
|
|
Inspection Type |
Planned
|
Scope |
NoInspection
|
Safety/Health |
Safety
|
Close Conference |
2021-03-11
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2021-03-11
|
|
345196133
|
1032500
|
2021-03-11
|
708 N DIVISION STREET, PINEHURST, ID, 83850
|
|
Inspection Type |
Planned
|
Scope |
NoInspection
|
Safety/Health |
Safety
|
Close Conference |
2021-03-11
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2021-03-11
|
|
343915880
|
1032500
|
2019-04-05
|
1593 EAST POLSTON AVE, POST FALLS, ID, 83854
|
|
Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2019-04-05
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2019-09-26
|
Related Activity
Type |
Inspection |
Activity Nr |
1391614 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Other |
Standard Cited |
19260020 B02 |
Issuance Date |
2019-04-22 |
Abatement Due Date |
2019-05-02 |
Current Penalty |
2319.0 |
Initial Penalty |
2319.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment: a) Jobsite: On April 5, 2019 and at times prior thereto site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify sub-contractor employees exposed to unserviceable equipment. A chop saw was used with the blade guard catcher missing and the blade guard pinned back. b) Jobsite: On April 5, 2019 and at times prior thereto site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify a temporary propane tank that was not adequately protected from vehicular traffic within the jobsite. Note) Certification of corrective actions are required for these items. |
|
Citation ID |
01001B |
Citaton Type |
Other |
Standard Cited |
19260300 A |
Issuance Date |
2019-04-22 |
Abatement Due Date |
2019-05-02 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.300(a): Hand tool(s), power tool(s) or similar equipment were not maintained in a safe condition: a) Jobsite: On April 5, 2019 and at times prior thereto site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify sub-contractor employees exposed to unserviceable equipment. A Dewalt chop saw blade guard catcher was missing and the guard was pinned back. Sub-contractor employees used the chop saw to cut metal framing. Note) Certification of corrective action is required for this item. |
|
Citation ID |
01001C |
Citaton Type |
Other |
Standard Cited |
19260300 B01 |
Issuance Date |
2019-04-22 |
Abatement Due Date |
2019-05-02 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use: a) Jobsite: On April 5, 2019 and at times prior thereto the site audits conducted by the controlling employer, Young Construction Group of Idaho, Inc., did not identify sub-contractor employees exposed to unserviceable equipment. A Dewalt chop saw blade guard was not used. The blade guard catcher was missing and the blade guard was pinned back. The sub-contractor employees used the chop saw to cut metal framing. Note) Certification of corrective action is required for this item. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260153 O |
Issuance Date |
2019-04-22 |
Abatement Due Date |
2019-05-02 |
Current Penalty |
1739.0 |
Initial Penalty |
1739.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
6 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.153(o): When damage to LP-Gas systems from vehicular traffic was a possibility, precautions against such damage were not taken: a) Jobsite: On April 5, 2019 and at times prior thereto a temporary propane tank was not adequately protected from vehicular traffic within the jobsite. A wooden railing positioned on two sides of the tank had been struck and was laying in pieces near the tank. Note) Certification of corrective action is required for this item. |
|
|
343915773
|
1032500
|
2019-04-05
|
2290 WEST PRAIRIE AVE, COEUR D ALENE, ID, 83815
|
|
Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2019-04-05
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2019-04-05
|
|
343472973
|
1032500
|
2018-09-19
|
CHILDREN'S VILLAGE 6350 N CHILDREN'S VILLAGE CT, COEUR D ALENE, ID, 83815
|
|
Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2018-09-19
|
Emphasis |
L: IDCON, P: IDCON
|
Case Closed |
2018-10-03
|
|
343344115
|
1032500
|
2018-07-26
|
1916 CHARLEVILLE, POST FALLS, ID, 83854
|
|
Inspection Type |
Referral
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2018-07-26
|
Case Closed |
2019-11-29
|
Related Activity
Type |
Referral |
Activity Nr |
1365316 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260760 A01 |
Issuance Date |
2018-10-29 |
Abatement Due Date |
2018-11-26 |
Current Penalty |
0.0 |
Initial Penalty |
5174.0 |
Final Order |
2018-11-26 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.760(a)(1): Except as provided by paragraph (a)(3) of this section, each employee engaged in a steel erection activity who was on a walking/working surface with an unprotected side or edge more than 15 feet* (4.6m) above a lower level was not protected from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, positioning device systems or fall restraint systems: (a) Real Life Ministries Field House: On or about July 26, 2018, and at times prior thereto, the controlling contractor Young Construction Group of Idaho, Inc. did not ensure that its sub-contracted employer B.F. Builders, Inc. protected its employees with a means of fall protection while installing the OptiLiner Banded Liner system, which exposed them to the hazard of falling approximately 30 feet ground to eave. Note: Abatement Certification and Documentation ARE required. |
|
|
342206075
|
1032500
|
2017-03-23
|
1604 EAST SELTICE WAY, POST FALLS, ID, 83854
|
|
Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2017-03-23
|
Case Closed |
2017-03-29
|
Related Activity
Type |
Complaint |
Activity Nr |
1193928 |
Safety |
Yes |
|
|
340622729
|
1032500
|
2015-05-07
|
170 E KATHLEEN AVE, COEUR D ALENE, ID, 83815
|
|
Inspection Type |
Planned |
Scope |
Complete |
Safety/Health |
Safety |
Close Conference |
2015-05-07 |
Emphasis |
L: IDCON, P: IDCON |
Case Closed |
2015-06-10 |
Related Activity
Type |
Inspection |
Activity Nr |
1062406 |
Safety |
Yes |
|
|