Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2016-07-19
|
Emphasis |
L: CRANE
|
Case Closed |
2017-02-10
|
Related Activity
Type |
Complaint |
Activity Nr |
1113177 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19100023 E03 IV |
Issuance Date |
2016-07-28 |
Abatement Due Date |
2016-08-23 |
Current Penalty |
1000.0 |
Initial Penalty |
2000.0 |
Final Order |
2016-08-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.23(e)(3)(iv): The anchoring of posts and framing of members for railings of all types were not of such construction that the completed structure was not capable of withstanding a load of at least 200 pounds applied in any direction at any point on the top rail: a) On or about July 19, 2016, and at times prior thereto, the work-platform utilized by employees had two broken welds. Note: Abatement certification IS required for this item. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19100147 C04 I |
Issuance Date |
2016-07-28 |
Abatement Due Date |
2016-08-23 |
Current Penalty |
1000.0 |
Initial Penalty |
2000.0 |
Final Order |
2016-08-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. (a) Electric Bridge Crane J14-000003. (b) Electric Bridge Crane J14-000002. Note: Abatement certification IS required for this item. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19100179 L01 |
Issuance Date |
2016-07-28 |
Abatement Due Date |
2016-08-23 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2016-08-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.179(l)(1): A preventive maintenance program based on the crane manufacturer's recommendations was not established: (a) Warehouse: On or about July 19, 2016, and at times prior thereto, Electric Bridge Crane. Note: Abatement certification IS required for this item. |
|
Citation ID |
02002 |
Citaton Type |
Other |
Standard Cited |
19100179 J02 |
Issuance Date |
2016-07-28 |
Abatement Due Date |
2016-08-23 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2016-08-16 |
Nr Instances |
1 |
Nr Exposed |
4 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.179(j)(2): The items listed in subparagraphs (j)(2)(i)-(vii) were not inspected for defects at intervals as defined in paragraph (j)(1)(ii) of this section or as specifically indicated, and all deficiencies were not carefully examined and a determination made as to whether they constituted a safety hazard (a) Warehouse: On or about July 19, 2016 and at times prior thereto, the employer did not assess and determine during frequent inspections in accordance to the frequencies specified in paragraphs (j)(2) and (j)(1), whether "disassembly and/or more advanced examination methods than visual inspections" are required. Note: Abatement certification IS required. |
|
Citation ID |
02003 |
Citaton Type |
Other |
Standard Cited |
19100179 J03 |
Issuance Date |
2016-07-28 |
Abatement Due Date |
2016-08-23 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2016-08-16 |
Nr Instances |
1 |
Nr Exposed |
4 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.179(j)(3): Complete inspections of the crane was not being performed at intervals as generally defined in paragraph (j)(1)(ii)(b) of this section: (a) Bridge Crane: On or about July 19, 2016, and at times prior thereto, the employer did not incorporate a detailed periodic visual and operational inspection whereby individual components are examined to determine their condition. The Periodic Inspection is performed as often as quarterly based on service, environmental and application factors as determined by a qualified person. Note: Abatement certification IS required for this item. |
|
|