Name: | PERFORMANCE CONTRACTING, INC. |
Jurisdiction: | Idaho |
Legal type: | Foreign Business Corporation |
Status: | Active-Good Standing |
Date of registration: | 26 Apr 1985 (40 years ago) |
Financial Date End: | 30 Apr 2025 |
Entity Number: | 245433 |
Place of Formation: | KANSAS |
File Number: | 245433 |
Principal Address: | 11145 THOMPSON AVE LENEXA, KS 66219 |
Mailing Address: | AMANDA MCCRACKEN 11145 THOMPSON AVE LENEXA, KS 66219-2302 |
Name | Role | Address |
---|---|---|
CORPORATION SERVICE COMPANY | Agent | 1305 12TH AVE RD, NAMPA, ID 83686 |
Name | Role | Address | Appointed On |
---|---|---|---|
JASON S HEDNRICKS | President | 11145 THOMPSON AVENUE, LENEXA, KS 66219 | 2021-03-24 |
Name | Role | Address | Appointed On |
---|---|---|---|
RICK K SUTPHIN | Vice President | 11145 THOMPSON AVE, LENEXA, KS 66219 | 2024-04-03 |
GILBERT J RIEMANN | Vice President | 1203 MAIN STREET, GRANDVIEW, MO 64030 | 2024-04-03 |
SHAWN P BURNUM | Vice President | 11145 THOMPSON AVE, LENEXA, KS 66219-2302 | 2024-04-03 |
DAVID A GASS | Vice President | 11145 THOMPSON AVE, LENEXA, KS 66219-2302 | 2024-04-03 |
BRIAN J KAVANAGH | Vice President | 9810 MAYFLOWER PARK DRIVE, CARMEL, IN 46032 | 2024-04-03 |
DIONISIOS DENNIS PAPATHANASOPOULOS | Vice President | 21670 RED RUM DRIVE, ASHBURN, VA 20147 | 2024-04-03 |
MATTHEW H GREGORIO | Vice President | 11145 THOMPSON AVE, LENEXA, KS 66219-2302 | 2024-04-03 |
TIMOTHY SETTLES | Vice President | 11145 THOMPSON AVE, LENEXA, KS 66219-2302 | 2024-04-03 |
GREG R WIEMERS | Vice President | 11145 THOMPSON AVENUE, LENEXA, KS 66219 | 2024-04-03 |
Brett A. Dahmer | Vice President | 11145 THOMPSON AVE, LENEXA, KS 66219-2302 | 2024-04-03 |
Name | Role | Address | Appointed On |
---|---|---|---|
ROBERT A CLAYTON | Treasurer | 11145 THOMPSON AVENUE, LENEXA, KS 66219 | 2024-04-03 |
Name | Role | Address | Appointed On |
---|---|---|---|
MICHAEL T METCALF | Secretary | 11145 THOMPSON AVENUE, LENEXA, KS 66219 | 2024-04-03 |
SUZANNE M MCNAIR | Secretary | 11145 THOMPSON AVENUE, LENEXA, KS 66219 | 2024-04-03 |
Name | Role | Address | Appointed On |
---|---|---|---|
JASON S HENDRICKS | Director | 11145 THOMPSON AVENUE, LENEXA, KS 66219 | 2024-04-03 |
Filing Name | Filing Number | Filing date |
---|---|---|
Change of Registered Office/Agent/Both (by Entity) | 0005732569 | 2024-05-09 |
Annual Report | 0005669748 | 2024-04-03 |
Annual Report | 0005214182 | 2023-04-28 |
Annual Report | 0004705849 | 2022-04-19 |
Change of Registered Office/Agent/Both (by Entity) | 0004554738 | 2022-01-05 |
Annual Report | 0004217540 | 2021-03-24 |
Annual Report | 0003817826 | 2020-03-23 |
Annual Report | 0003461402 | 2019-03-25 |
Annual Report | 0001920490 | 2018-03-16 |
Annual Report | 0001920489 | 2017-04-17 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345397566 | 1032500 | 2021-07-01 | 900 STADIUM DR., MOSCOW, ID, 83843 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1539759 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Other |
Standard Cited | 19260451 C02 |
Issuance Date | 2021-09-03 |
Abatement Due Date | 2021-09-30 |
Current Penalty | 5803.0 |
Initial Penalty | 5803.0 |
Final Order | 2021-09-15 |
Nr Instances | 1 |
Nr Exposed | 11 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: (a) North Stairwell: On or about July 1, 2021 and at times prior; employees were exposed to fall hazards while on a fabricated frame scaffold installing metal studs to the ceiling of a stairwell. One section of the scaffold did not have base plates, instead casters were used and placed on stair treads. This was not being used as a mobile scaffolding. Note: Abatement certification AND supporting documentation are required for this item. |
Citation ID | 01001B |
Citaton Type | Other |
Standard Cited | 19260452 C02 |
Issuance Date | 2021-09-03 |
Abatement Due Date | 2021-09-30 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2021-09-15 |
Nr Instances | 1 |
Nr Exposed | 11 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.452(c)(2): Frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which secure vertical members together laterally. (a) North Stairwell: On or about July 1, 2021 and at times prior; employees were exposed to fall hazards while on a fabricated frame scaffold installing metal studs to the ceiling of a stairwell. The bottom section of the scaffold did not have cross bracing. Note: Abatement certification AND supporting documentation are required for this item. |
Citation ID | 01002 |
Citaton Type | Other |
Standard Cited | 19260034 A |
Issuance Date | 2021-09-03 |
Abatement Due Date | 2021-09-30 |
Current Penalty | 3481.0 |
Initial Penalty | 3481.0 |
Final Order | 2021-09-15 |
Nr Instances | 2 |
Nr Exposed | 15 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.34(a): Building or structure exits were not so arranged and maintained as to provide free and unobstructed egress from all parts of the building or structure at all times when it was occupied: (a) North Stairwell: On or about July 1, 2021 and at times prior; employees were exposed to burns and/or smoke inhalation if a fire occurred. Cross bracing of the scaffolding was impeding travel down the stairwell. (b) South Stairwell: On or about July 1, 2021 and at times prior; employees were exposed to burns and/or smoke inhalation if a fire occurred. The baker scaffold was placed on the stairwell leaving 17 inches of travel. Note: Abatement certification is required for this item. |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2009-01-13 |
Emphasis | S: COMMERCIAL CONSTR, L: IDCON |
Case Closed | 2009-03-05 |
Date of last update: 10 Mar 2025
Sources: Idaho Secretary of State