Secondary Sic |
Lead
|
Directions to Mine |
I84 E, to exit 114, left onto Hwy 28, West at MM 27, go 3 miles SW on dirt road, located in sourdough gulch
|
Parties
Name
|
Democrat Resources LLC
|
Role
|
Operator
|
Start Date
|
2011-04-01
|
|
Name
|
Petro-Chem Inc
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1983-05-17
|
|
Name
|
Democrat Resources Inc
|
Role
|
Operator
|
Start Date
|
1983-05-18
|
End Date
|
1987-06-30
|
|
Name
|
Democrat Mine
|
Role
|
Operator
|
Start Date
|
1987-07-01
|
End Date
|
2011-03-31
|
|
Name
|
Sandy Sims; Eric Sims
|
Role
|
Current Controller
|
Start Date
|
2011-04-01
|
|
Name
|
Democrat Resources LLC
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2011-11-14
|
Degree Inhury |
OCCUPATNAL ILLNESS NOT DEG 1-6
|
Accident Type |
Absorption of radiations, caustics, toxic and noxious substances
|
Ocupation |
Ledgeman/hand, Quarry man
|
Narrative |
EE has been diagnosed with elevated lead blood levels (lead poisoning) He has been working with ore that contains silver, lead, gold and zinc. Work includes drilling and blasting and removal of the ore and waste while following a small exploration vein underground. The extent of his illness and impairment is not known at this time. In retrospect, symptoms began in Oct 2011.
|
|
Accident Date |
2011-06-15
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Contact with hot objects or substances
|
Ocupation |
Ledgeman/hand, Quarry man
|
Narrative |
EE burned old blasting caps and other refuse on the waste dump on the surface, away from the portal and buildings. He used diesel soaked paper towels to ignite the fire. Upon ignition an explosion occurred which caused lacerations and burns.
|
|
Inspections
Start Date |
2012-10-10
|
End Date |
2012-10-10
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
17.5
|
|
Start Date |
2012-07-24
|
End Date |
2012-07-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.75
|
|
Start Date |
2011-11-29
|
End Date |
2011-11-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
39.5
|
|
Start Date |
2011-11-15
|
End Date |
2011-11-16
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2011-10-25
|
End Date |
2011-10-26
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
12.25
|
|
Productions
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2012
|
Annual Hours
|
2816
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
939
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2012
|
Annual Hours
|
864
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
864
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2011
|
Annual Hours
|
4509
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1127
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2011
|
Annual Hours
|
1800
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
900
|
|
|