Name: | DONAHUE MCNAMARA STEEL LLC |
Jurisdiction: | Idaho |
Legal type: | Limited Liability Company (D) |
Status: | Active-Existing |
Date of registration: | 02 Jan 2007 (18 years ago) |
Financial Date End: | 31 Jan 2026 |
Entity Number: | 184468 |
Place of Formation: | IDAHO |
File Number: | 184468 |
ZIP code: | 83353 |
County: | Blaine County |
Principal Address: | PO BOX 1250 SUN VALLEY, ID 83353 |
Mailing Address: | ROSE BURBANK PO BOX 1590 MERIDIAN, ID 83680-1590 |
Type | Company Name | Company Number | State |
---|---|---|---|
Headquarter of | DONAHUE MCNAMARA STEEL LLC, MISSISSIPPI | 1245597 | MISSISSIPPI |
Headquarter of | DONAHUE MCNAMARA STEEL LLC, COLORADO | 20141041536 | COLORADO |
Plan Name | Plan Year | EIN/PN | Received | Sponsor | Total number of participants | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2023 | 208234869 | 2024-10-14 | DONAHUE MCNAMARA STEEL, LLC | 104 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2022 | 208234869 | 2023-12-11 | DONAHUE MCNAMARA STEEL, LLC | 120 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2022 | 208234869 | 2023-12-11 | DONAHUE MCNAMARA STEEL, LLC | 102 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2022 | 208234869 | 2023-10-16 | DONAHUE MCNAMARA STEEL, LLC | 112 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2021 | 208234869 | 2023-12-11 | DONAHUE MCNAMARA STEEL, LLC | 98 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2021 | 208234869 | 2022-08-26 | DONAHUE MCNAMARA STEEL, LLC | 98 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2020 | 208234869 | 2021-10-15 | DONAHUE MCNAMARA STEEL, LLC | 95 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2020 | 208234869 | 2023-12-11 | DONAHUE MCNAMARA STEEL, LLC | 96 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2020 | 208234869 | 2022-08-29 | DONAHUE MCNAMARA STEEL, LLC | 96 | |||||||||||||
|
||||||||||||||||||
DONAHUE MCNAMARA STEEL, LLC PROFIT SHARING PLAN | 2019 | 208234869 | 2021-02-17 | DONAHUE MCNAMARA STEEL, LLC | 120 | |||||||||||||
|
Name | Role | Address | Appointed On |
---|---|---|---|
Ryan K Donahue | Member | PO BOX 1590, MERIDIAN, ID 83680-1590 | 2020-12-03 |
Name | Role | Address |
---|---|---|
NORTHWEST REGISTERED AGENT LLC | Agent | 784 S CLEARWATER LOOP STE B, POST FALLS, ID 83854 |
Filing Name | Filing Number | Filing date |
---|---|---|
Annual Report | 0006007343 | 2024-12-04 |
Annual Report | 0005495438 | 2023-12-04 |
Annual Report | 0005008135 | 2022-12-03 |
Annual Report | 0004521329 | 2021-12-07 |
Annual Report | 0004083192 | 2020-12-03 |
Annual Report | 0003693572 | 2019-12-02 |
Annual Report | 0003372291 | 2018-12-14 |
Annual Report | 0001652444 | 2017-12-29 |
Annual Report | 0001652443 | 2016-12-23 |
Annual Report | 0001652442 | 2015-11-19 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
347642068 | 1032500 | 2024-07-24 | 1815 W CESAR CHAVEZ LN, BOISE, ID, 83702 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1764205 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1764215 |
Health | Yes |
Type | Inspection |
Activity Nr | 1764213 |
Health | Yes |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2021-02-17 |
Emphasis | N: CTARGET, P: CTARGET |
Case Closed | 2021-02-17 |
Related Activity
Type | Inspection |
Activity Nr | 1515171 |
Safety | Yes |
Inspection Type | Prog Related |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2019-03-27 |
Case Closed | 2019-04-03 |
Related Activity
Type | Inspection |
Activity Nr | 1388473 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1388570 |
Safety | Yes |
Inspection Type | Complaint |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2017-09-26 |
Emphasis | L: FALL, L: PIV |
Case Closed | 2017-10-23 |
Related Activity
Type | Inspection |
Activity Nr | 1236116 |
Health | Yes |
Type | Complaint |
Activity Nr | 1216261 |
Safety | Yes |
Health | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260251 A04 |
Issuance Date | 2017-09-28 |
Abatement Due Date | 2017-11-16 |
Current Penalty | 3549.0 |
Initial Penalty | 5070.0 |
Final Order | 2017-10-16 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.251(a)(4): Special custom design grabs, hooks, clamps, or other lifting accessories, for such units as modular panels, prefabricated structures and similar materials, shall be marked to indicate the safe working loads and shall be proof-tested prior to use to 125 percent of their rated load. a) Lifting devices made in house for the panels were not tested and marked to indicate its lifting capacity and testing for the rated loads. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2016-11-30 |
Emphasis | L: FALL |
Case Closed | 2017-08-25 |
Related Activity
Type | Referral |
Activity Nr | 1114851 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1163207 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1163217 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260352 A |
Issuance Date | 2016-12-13 |
Abatement Due Date | 2017-01-10 |
Current Penalty | 5000.0 |
Initial Penalty | 7857.0 |
Final Order | 2017-01-06 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.352(a): Movable fire hazards in the vicinity of unmovable objects that were to be welded on, cut or heated were not taken to a safe place, or otherwise protected: a) On or about July 18, 2016 and at times prior thereto employees were welding in an aerial lift, where a 100 percent cotton tarp, lumber, and other combustibles were contained within the aerial lift. NOTE-Abatement certification and documentation are required for this item. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260352 D |
Issuance Date | 2016-12-13 |
Abatement Due Date | 2017-01-10 |
Current Penalty | 5000.0 |
Initial Penalty | 7857.0 |
Final Order | 2017-01-06 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.352(d): Suitable fire extinguishing equipment was not immediately available in the work area(s) where welding, cutting, or heating was being performed: a) On or about July 18, 2016 and at times prior thereto employees were welding in an aerial lift, where an inadequate Class 10-B/C fire extinguisher was used to attempt to extinguish combustible galvanized steel, a cotton tarp, welding lead coating, and various pieces of wood. NOTE-Abatement certification and documentation are required for this item. |
Citation ID | 01003 |
Citaton Type | Other |
Standard Cited | 19260354 C02 |
Issuance Date | 2016-12-13 |
Abatement Due Date | 2017-03-01 |
Current Penalty | 2000.0 |
Initial Penalty | 4770.0 |
Final Order | 2017-01-06 |
Nr Instances | 1 |
Nr Exposed | 2 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.354(c)(2): Employee(s) were not protected by a respirator, in accordance with the requirements of 29 CFR 1926 Subpart E, when welding, cutting or heating toxic preservative coatings in open air. a) On or about July 18, 2016 and at times prior thereto employees were welding galvanized coated steel, from an aerial lift outside under an overhang, where no respirators were available or used. No assessment of worker exposure to hazardous chemicals, such as zinc fume, had been conducted. NOTE-Abatement certification is required for this item. |
Inspection Type | Unprog Rel |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2012-04-26 |
Emphasis | L: FALL |
Case Closed | 2012-07-13 |
Related Activity
Type | Inspection |
Activity Nr | 405702 |
Safety | Yes |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2011-03-09 |
Emphasis | L: FALL |
Case Closed | 2011-04-20 |
Related Activity
Type | Referral |
Activity Nr | 20543 |
Safety | Yes |
Type | Inspection |
Activity Nr | 29197 |
Safety | Yes |
Type | Inspection |
Activity Nr | 29199 |
Safety | Yes |
Inspection Type | Prog Related |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2010-08-18 |
Emphasis | S: COMMERCIAL CONSTR |
Case Closed | 2010-09-16 |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2010-03-31 |
Emphasis | S: NOISE, L: ARRACON, S: COMMERCIAL CONSTR |
Case Closed | 2010-04-30 |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6569317104 | 2020-04-14 | 1087 | PPP | 111 N. 1st Ave, Ste 2A, HAILEY, ID, 83333 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Date of last update: 01 Apr 2025
Sources: Idaho Secretary of State