Inspection Type |
Unprog Rel
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2012-03-27
|
Emphasis |
L: FALL, L: RESCON
|
Case Closed |
2016-07-29
|
Related Activity
Type |
Inspection |
Activity Nr |
283524 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
283584 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19260100 A |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-04-13 |
Current Penalty |
1440.0 |
Initial Penalty |
1440.0 |
Final Order |
2012-05-08 |
Nr Instances |
1 |
Nr Exposed |
4 |
Related Event Code (REC) |
Referral |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns: a) Main and side facade areas of the structure, at the ground, 1st and 2nd level of scaffold: On or about March 27, 2012, and at times prior thereto, employees performing stucco work were walking/working below other workers on a tubular welded scaffold without wearing a protective helmet. Note: Abatement certification IS required for this item. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19260451 H02 |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-04-13 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2012-05-08 |
Nr Instances |
1 |
Nr Exposed |
4 |
Related Event Code (REC) |
Referral |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(h)(2): Where there was a danger of tools, materials, or equipment falling from a scaffold and striking employees below, the provisions of paragraphs (h)(2)(i) - (v) of this section were not followed: a) Main entrance of the structure: On or about March 27, 2012, and at times prior thereto, other subcontractor's employees were walking under the tubular welded scaffold being utilized for stucco work that was lacking toe-boards or other protective means to the entrance of the structure. Note: Abatement certification IS required for this item. |
|
Citation ID |
01002A |
Citaton Type |
Serious |
Standard Cited |
19260451 B04 |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-04-13 |
Current Penalty |
1440.0 |
Initial Penalty |
1440.0 |
Final Order |
2012-05-08 |
Nr Instances |
1 |
Nr Exposed |
4 |
Related Event Code (REC) |
Referral |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(4): Each end of a platform, which was not cleated or otherwise restrained by hooks or equivalent means, did not extend over the centerline of its support by at least 6 inches: a) Main and side facade areas of the structure, at all levels of the scaffold; On or about March 27, 2012, and at times prior thereto, four employees performing stucco work were utilizing tubular welded frame scaffold that had unsecured planks bridging across from one stand of scaffold to another. One end of the planks did not extend at least 6 inches beyond their support. Note: Abatement certification IS required for this item. |
|
Citation ID |
01002B |
Citaton Type |
Serious |
Standard Cited |
19260451 B03 II |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-04-13 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2012-05-08 |
Nr Instances |
1 |
Nr Exposed |
4 |
Related Event Code (REC) |
Referral |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(3)(ii): The maximum distance from the face for plastering and lathing operations exceeded 18 inches (46 cm). a) Main entrance area of the structure, left and right sides of entry, at all levels of the scaffold; On or about March 27, 2012, and at times prior thereto, four employees performing stucco work were utilizing tubular welded frame scaffold where sections of the scaffold was not within 18 inches of the structure's facade. Note: Abatement certification IS required for this item. |
|
Citation ID |
01002C |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-04-13 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2012-05-08 |
Nr Instances |
1 |
Nr Exposed |
4 |
Related Event Code (REC) |
Referral |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. (a) Main and side facade areas of the structure, at the 2nd level of the scaffold; On or about March 27, 2012, and at times prior thereto, four employees performing stucco work were utilizing tubular welded scaffold that was missing and/or had inadequate guardrails and/or end-rails. Note: Abatement certification IS required for this item. |
|
Citation ID |
01002D |
Citaton Type |
Serious |
Standard Cited |
19260454 A |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-05-10 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2012-05-08 |
Nr Instances |
1 |
Nr Exposed |
4 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) Main and side facade areas of the structure, at the ground, 1st and 2nd level of scaffold; On or about March 27, 2012, and at times prior thereto, four employees performing stucco work from tubular welded scaffold demonstrated a lack of understanding and recognition of the potential hazards associated with deficiencies including but not limited to, inadequate/missing guardrails and/or end-rails, inadequate bracing and platforms. and the means for proper access/egress. Note: Abatement certification IS required for this item. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260451 E01 |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-04-13 |
Current Penalty |
1440.0 |
Initial Penalty |
1440.0 |
Final Order |
2012-05-08 |
Nr Instances |
3 |
Nr Exposed |
4 |
Related Event Code (REC) |
Referral |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. a) Main and side facade areas of the structure, at all levels of the scaffold; On or about March 27, 2012, and at times prior thereto, four employees performing stucco work were climbing the end frames of the tubular welded frame scaffold as a means of access. b) Main and side facade areas of the structure, at all levels of the scaffold; On or about March 27, 2012, and at times prior thereto, four employees performing stucco work were climbing the crossbracing of the tubular welded frame scaffold as a means of access. c) Main and side facade areas of the structure, at the 1st level of the scaffold; On or about March 27, 2012, and at times prior thereto, an employee performing stucco work jumped from the tubular welded frame scaffold down to the ground. Note: Abatement certification IS required for this item. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19260451 C02 |
Issuance Date |
2012-04-12 |
Abatement Due Date |
2012-04-13 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2012-05-08 |
Nr Instances |
1 |
Nr Exposed |
4 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) Main and side facade areas of the structure, at the ground level of scaffold; On or about March 27, 2012, and at times prior thereto, four employees performing stucco work were utilizing a tubular welded scaffold that was missing numerous base plates and/or mud sills. Note: Abatement certification IS required for this item. |
|
|