Name: | WESTERN CONSTRUCTION, INC. |
Jurisdiction: | Idaho |
Legal type: | General Business Corporation (D) |
Status: | Active-Good Standing |
Date of registration: | 15 Sep 1961 (64 years ago) |
Financial Date End: | 30 Sep 2025 |
Entity Number: | 111809 |
Place of Formation: | IDAHO |
File Number: | 111809 |
Mailing Address: | LAURIE A. SMITH 10139 S FEDERAL WAY BOISE, ID 83716-9636 |
CAGE number | Status | Type | Established | CAGE Update Date | CAGE Expiration | SAM Expiration | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1MBB3 | Active | Non-Manufacturer | 1999-08-13 | 2024-08-12 | 2029-08-12 | 2025-08-08 | |||||||||||||
|
POC | STEVE NETT |
Phone | +1 208-869-6897 |
Address | 10139 S FEDERAL WAY, BOISE, ID, 83716 9636, UNITED STATES |
Ownership of Offeror Information
Highest Level Owner | Information not Available |
---|
Immediate Level Owner | Information not Available |
---|
List of Offerors (0) | Information not Available |
---|
Plan Name | Plan Year | EIN/PN | Received | Sponsor | Total number of participants | |||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
WESTERN CONSTRUCTION, INC. MONEY PURCHASE PENSION PLAN | 2023 | 820254196 | 2024-03-01 | WESTERN CONSTRUCTION, INC. | 34 | |||||||||||||||||||||||||||||||
|
Role | Plan administrator |
Date | 2024-03-01 |
Name of individual signing | STEVE NETT |
Valid signature | Filed with authorized/valid electronic signature |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 S. FEDERAL WAY, BOISE, ID, 83716 |
Signature of
Role | Plan administrator |
Date | 2023-05-26 |
Name of individual signing | STEVE NETT |
Valid signature | Filed with authorized/valid electronic signature |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 S. FEDERAL WAY, BOISE, ID, 83716 |
Signature of
Role | Plan administrator |
Date | 2022-01-21 |
Name of individual signing | STEVE NETT |
Valid signature | Filed with authorized/valid electronic signature |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 S. FEDERAL WAY, BOISE, ID, 83716 |
Signature of
Role | Plan administrator |
Date | 2021-06-03 |
Name of individual signing | STEVE NETT |
Valid signature | Filed with authorized/valid electronic signature |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 S. FEDERAL WAY, BOISE, ID, 83716 |
Signature of
Role | Plan administrator |
Date | 2020-03-02 |
Name of individual signing | STEVEN C. HEATON |
Valid signature | Filed with authorized/valid electronic signature |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 S. FEDERAL WAY, BOISE, ID, 83716 |
Signature of
Role | Plan administrator |
Date | 2019-02-20 |
Name of individual signing | STEVEN C. HEATON |
Valid signature | Filed with authorized/valid electronic signature |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Plan administrator’s name and address
Administrator’s EIN | 820254196 |
Plan administrator’s name | WESTERN CONSTRUCTION, INC. |
Plan administrator’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Administrator’s telephone number | 2083451440 |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Plan administrator’s name and address
Administrator’s EIN | 820254196 |
Plan administrator’s name | WESTERN CONSTRUCTION, INC. |
Plan administrator’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Administrator’s telephone number | 2083451440 |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Plan administrator’s name and address
Administrator’s EIN | 820254196 |
Plan administrator’s name | WESTERN CONSTRUCTION, INC. |
Plan administrator’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Administrator’s telephone number | 2083451440 |
File | View Page |
Three-digit plan number (PN) | 002 |
Effective date of plan | 1988-07-01 |
Business code | 237310 |
Sponsor’s telephone number | 2083451440 |
Plan sponsor’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Plan administrator’s name and address
Administrator’s EIN | 820254196 |
Plan administrator’s name | WESTERN CONSTRUCTION, INC. |
Plan administrator’s address | 10139 FEDERAL WAY, BOISE, ID, 837169636 |
Administrator’s telephone number | 2083451440 |
Signature of
Role | Plan administrator |
Date | 2015-02-05 |
Name of individual signing | STEVEN C. HEATON |
Valid signature | Filed with authorized/valid electronic signature |
Name | Role | Address |
---|---|---|
STEVEN C HEATON | Agent | 10139 SOUTH FEDERAL WAY, BOISE, ID 83716 |
Name | Role | Address | Appointed On |
---|---|---|---|
STEVEN C. HEATON | President | 10139 SOUTH FEDERAL WAY, BOISE, ID 83716 | 2020-10-05 |
Name | Role | Address | Appointed On |
---|---|---|---|
NICHOLE D. HEATON | Secretary | 10139 S. FEDERAL WAY, BOISE, ID 83716 | 2023-09-11 |
Filing Name | Filing Number | Filing date |
---|---|---|
Annual Report | 0005852496 | 2024-08-08 |
Annual Report Amendment | 0005709462 | 2024-05-01 |
Annual Report | 0005397649 | 2023-09-11 |
Annual Report | 0004937315 | 2022-10-05 |
Annual Report | 0004457105 | 2021-10-21 |
Annual Report | 0004024569 | 2020-10-05 |
Annual Report | 0003608449 | 2019-08-28 |
Annual Report | 0001343869 | 2018-07-30 |
Annual Report | 0001343868 | 2017-07-25 |
Annual Report | 0001343866 | 2016-07-26 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No 3 Pit | Surface | Abandoned | Construction Sand and Gravel | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Western Construction Inc |
Role | Operator |
Start Date | 1950-01-01 |
End Date | 1979-04-08 |
Name | Nelson Sand & Gravel Company Inc |
Role | Operator |
Start Date | 1979-04-09 |
Name | Donald J Nelson |
Role | Current Controller |
Start Date | 1979-04-09 |
Name | Nelson Sand & Gravel Company Inc |
Role | Current Operator |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1950-01-01 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1950-01-01 |
Name | Western Construction Inc |
Role | Current Operator |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1950-01-01 |
End Date | 1980-04-30 |
Name | Bonneville County Road & Bridge Department |
Role | Operator |
Start Date | 1980-05-01 |
Name | Bonneville County-ID |
Role | Current Controller |
Start Date | 1980-05-01 |
Name | Bonneville County Road & Bridge Department |
Role | Current Operator |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1978-03-09 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1978-03-09 |
Name | Western Construction Inc |
Role | Current Operator |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1979-01-01 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1979-01-01 |
Name | Western Construction Inc |
Role | Current Operator |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1979-01-01 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1979-01-01 |
Name | Western Construction Inc |
Role | Current Operator |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1982-12-01 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1982-12-01 |
Name | Western Construction Inc |
Role | Current Operator |
Directions to Mine | East of Boise, ID on I-84 approx 2 miles on left side of hwy. |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1984-03-01 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1984-03-01 |
Name | Western Construction Inc |
Role | Current Operator |
Accidents
Accident Date | 2022-02-14 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck against a moving object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | While backing up with head turned back, the dozer shifted on a rock suddenly and hit another rock which caused a whipping action & strained EE's neck. |
Accident Date | 2021-11-23 |
Degree Inhury | DYS AWY FRM WRK & RESTRCTD ACT |
Accident Type | Fall to the walkway or working surface |
Ocupation | Groundman, Yardman |
Narrative | The ground had some elevated areas where a person could stumble and fall if not paying attention to the surroundings. Employee sustained a back strain from tripping and falling next to the #2 screen plant. |
Accident Date | 2017-04-06 |
Degree Inhury | DYS AWY FRM WRK & RESTRCTD ACT |
Accident Type | Caught in, under or between running or meshing objects |
Ocupation | Groundman, Yardman |
Narrative | Conveyor belt stopped due to material build up. Employee went to clear material and belt rolled backwards. This caught employee's hand and pulled the arm into tail pulley. This broke employee's forearm. *After investigation it was determined the belt tightened back onto the roller after material was removed which trapped EE's forearm. |
Accident Date | 2016-11-07 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by flying object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | Releasing pin that holds oxygen tank retainer pin came loose striking employee in mouth |
Accident Date | 2016-05-07 |
Degree Inhury | ALL OTHER CASES (INCL 1ST AID) |
Accident Type | Contact with hot objects or substances |
Ocupation | Superintendent |
Narrative | Releasing cam locks on hose connected to water pump. Steam released the hose burning left side of body. |
Accident Date | 2013-09-03 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | Leaned over to close cab door on loader, pulled muscles around rib area. |
Accident Date | 2007-07-30 |
Degree Inhury | DYS AWY FRM WRK & RESTRCTD ACT |
Accident Type | Over-exertion NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Employee was welding on a roller on the feeder conveyor when he twisted his knee. |
Accident Date | 2003-09-07 |
Degree Inhury | DAYS RESTRICTED ACTIVITY ONLY |
Accident Type | Struck against a moving object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | INDIVIDUAL WAS OPERATING A PADDLE WHEEL SCRAPER REMOVING OVERBURDEN FOR A GRAVEL SOURCE. THE TERRAIN WAS ROUGH CAUSING IRRITATION TO THE NECK AND BACK. |
Accident Date | 2003-09-07 |
Degree Inhury | NO VALUE FOUND |
Accident Type | No Value Found |
Ocupation | NO VALUE FOUND |
Narrative | Indivdual was operating a paddle wheel scraper removing overburden for a gravel source. The terrain was rough causing irritaion to the neck and back. |
Accident Date | 2000-10-02 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against a moving object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | WHILE FEEDING CRUSHER WITH DOZER PRE EXISTING BACK CONDITION WAS AGGRAVATED BY THE CONSTANT JARRING OF RUNNING DOZER |
Inspections
Start Date | 2023-05-11 |
End Date | 2023-05-11 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 12.25 |
Start Date | 2022-08-17 |
End Date | 2022-08-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2021-05-10 |
End Date | 2021-05-11 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 12.25 |
Start Date | 2020-07-07 |
End Date | 2020-07-07 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 9.5 |
Start Date | 2019-07-10 |
End Date | 2019-07-11 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 16.25 |
Start Date | 2018-04-17 |
End Date | 2018-04-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 14.5 |
Start Date | 2017-06-21 |
End Date | 2017-06-21 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 5.75 |
Start Date | 2017-04-10 |
End Date | 2017-04-10 |
Activity | Non-Fatal Accident Investigation |
Number Inspectors | 1 |
Total Hours | 24 |
Start Date | 2017-03-14 |
End Date | 2017-03-15 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 29.75 |
Start Date | 2016-06-07 |
End Date | 2016-06-07 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.75 |
Start Date | 2015-07-07 |
End Date | 2015-07-07 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.5 |
Start Date | 2014-01-28 |
End Date | 2014-01-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 18 |
Start Date | 2012-10-25 |
End Date | 2012-10-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 14 |
Start Date | 2012-05-23 |
End Date | 2012-05-23 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 7.75 |
Start Date | 2012-05-15 |
End Date | 2012-05-15 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 13 |
Start Date | 2011-05-11 |
End Date | 2011-05-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 12.75 |
Start Date | 2010-01-26 |
End Date | 2010-01-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 21.25 |
Start Date | 2009-04-07 |
End Date | 2009-04-08 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 23.5 |
Start Date | 2009-03-26 |
End Date | 2009-03-26 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 9 |
Start Date | 2008-04-08 |
End Date | 2008-04-08 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 3 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2024 |
Annual Hours | 525 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 263 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2023 |
Annual Hours | 3808 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 544 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2022 |
Annual Hours | 6226 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 889 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2021 |
Annual Hours | 7861 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 1123 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2020 |
Annual Hours | 10149 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1269 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2019 |
Annual Hours | 8457 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1057 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2018 |
Annual Hours | 11595 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1449 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2017 |
Annual Hours | 7614 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 1088 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2016 |
Annual Hours | 5919 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 987 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2015 |
Annual Hours | 8929 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 1488 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2014 |
Annual Hours | 8647 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 1235 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2013 |
Annual Hours | 11697 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 1063 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2012 |
Annual Hours | 6279 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 897 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2011 |
Annual Hours | 9412 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 856 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2010 |
Annual Hours | 9288 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1161 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2009 |
Annual Hours | 10720 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 893 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2008 |
Annual Hours | 11847 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1481 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2007 |
Annual Hours | 19316 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 1288 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2006 |
Annual Hours | 21550 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 1347 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2005 |
Annual Hours | 13619 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 1513 |
Directions to Mine | East of Boise, ID on I-84 approx 2 miles on left side of hwy. |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1984-03-01 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1984-03-01 |
Name | Western Construction Inc |
Role | Current Operator |
Accidents
Accident Date | 2021-06-14 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by falling object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | Employee adjusting and pulling a sample. The sampler slid off the blocks and landed on employee's right thumb. Cut right thumb, received four stitches. |
Accident Date | 2020-04-27 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Over-exertion in lifting objects |
Ocupation | Crusher attendant/operator, Pan feeder operator/worker |
Narrative | Lifting guard into place. Tweeked back. Ice the area and restrict movement and lifting. |
Accident Date | 2004-03-01 |
Degree Inhury | DYS AWY FRM WRK & RESTRCTD ACT |
Accident Type | No Value Found |
Ocupation | NO VALUE FOUND |
Narrative | Setting chute to screen plant. Chute was checked to insure it was secure. Crane was unhooked from chute. Hook caught chute as it was moving out of the way and dislodged the chute. Employee and chute fell to the ground appx. 3-4 feet. then fell over. Employees ribs were bruised/broke and two fingers dislocated. |
Inspections
Start Date | 2024-10-08 |
End Date | 2024-10-09 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 11.75 |
Start Date | 2023-12-12 |
End Date | 2023-12-12 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 1 |
Total Hours | 1 |
Start Date | 2023-12-12 |
End Date | 2023-12-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2023-07-12 |
End Date | 2023-07-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8.5 |
Start Date | 2022-04-13 |
End Date | 2022-04-13 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2021-10-13 |
End Date | 2021-10-13 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8.5 |
Start Date | 2021-05-03 |
End Date | 2021-05-03 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 6.75 |
Start Date | 2020-11-09 |
End Date | 2020-11-10 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 18.75 |
Start Date | 2020-09-14 |
End Date | 2020-09-15 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 19.75 |
Start Date | 2020-06-16 |
End Date | 2020-06-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 21.5 |
Start Date | 2019-12-04 |
End Date | 2019-12-05 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 20 |
Start Date | 2019-02-25 |
End Date | 2019-02-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 14 |
Start Date | 2018-03-12 |
End Date | 2018-03-14 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 30.25 |
Start Date | 2017-03-29 |
End Date | 2017-03-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 13 |
Start Date | 2017-02-14 |
End Date | 2017-02-14 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2015-10-14 |
End Date | 2015-10-15 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 33.75 |
Start Date | 2014-09-24 |
End Date | 2014-10-01 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 27.25 |
Start Date | 2014-02-25 |
End Date | 2014-02-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 26 |
Start Date | 2012-10-17 |
End Date | 2012-10-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 31.5 |
Start Date | 2012-07-17 |
End Date | 2012-07-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 22 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2024 |
Annual Hours | 11002 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 917 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2023 |
Annual Hours | 4526 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 647 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2022 |
Annual Hours | 4927 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 547 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2021 |
Annual Hours | 7979 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 997 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2020 |
Annual Hours | 11080 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 1231 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2019 |
Annual Hours | 13271 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1659 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2018 |
Annual Hours | 11357 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 1136 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2017 |
Annual Hours | 8314 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 1188 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2016 |
Annual Hours | 6072 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 759 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2015 |
Annual Hours | 7507 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 938 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2014 |
Annual Hours | 9754 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 975 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2013 |
Annual Hours | 9699 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 808 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2012 |
Annual Hours | 4229 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 529 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2011 |
Annual Hours | 11716 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 1065 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2010 |
Annual Hours | 9292 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 715 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2009 |
Annual Hours | 7506 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 469 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2008 |
Annual Hours | 17282 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 1728 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2007 |
Annual Hours | 18447 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 1419 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2006 |
Annual Hours | 17645 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 1357 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2005 |
Annual Hours | 18833 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 1256 |
Directions to Mine | PORTABLE OPERATION LOCATION VARIES |
Parties
Name | Western Construction Inc |
Role | Operator |
Start Date | 1986-04-01 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 1986-04-01 |
Name | Western Construction Inc |
Role | Current Operator |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2000 |
Annual Hours | 2558 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 365 |
Directions to Mine | Access off o HWy 93 and Cross Roads Point Blvd |
Parties
Name | Western Construction, Inc. |
Role | Operator |
Start Date | 2025-01-17 |
Name | Steven C Heaton |
Role | Current Controller |
Start Date | 2025-01-17 |
Name | Western Construction, Inc. |
Role | Current Operator |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
344669841 | 1032500 | 2020-03-04 | I86, RAFT RIVER BRIDGE, BURLEY, ID, 83318 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
344658208 | 1032500 | 2020-02-19 | US 30 MP 170.9, BLISS, ID, 83314 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
342935350 | 1032500 | 2018-02-08 | US 95 BETWEEN MP 97 AND 98, PAYETTE, ID, 83661 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
341468874 | 1032500 | 2016-05-10 | THORTON INTERCHANGE HWY 20, REXBURG, ID, 83440 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1089258 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Other |
Standard Cited | 5A0001 |
Issuance Date | 2016-07-22 |
Abatement Due Date | 2016-08-17 |
Current Penalty | 4900.0 |
Initial Penalty | 4900.0 |
Final Order | 2016-08-10 |
Nr Instances | 1 |
Nr Exposed | 1 |
FTA Current Penalty | 0.0 |
Citation text line | OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to burns when re-priming and adjusting water pumps. (a) Material excavation site: On or about May 9, 2016 employees releasing pressure to facilitate re-priming a Barnes self-priming centrifugal water pump. Abatement certification and documentation is required for this item |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Close Conference | 2014-12-04 |
Emphasis | N: CTARGET, P: CTARGET |
Case Closed | 2014-12-04 |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2014-06-10 |
Emphasis | N: CTARGET, P: CTARGET |
Case Closed | 2014-08-11 |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Close Conference | 2014-05-21 |
Emphasis | N: CTARGET, P: CTARGET |
Case Closed | 2014-05-21 |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2014-03-24 |
Emphasis | L: IDCON, P: IDCON |
Case Closed | 2014-06-09 |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Close Conference | 2013-12-19 |
Emphasis | N: CTARGET, P: CTARGET |
Case Closed | 2013-12-23 |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Close Conference | 2013-12-16 |
Emphasis | N: CTARGET, P: CTARGET |
Case Closed | 2013-12-23 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2010-07-14 |
Emphasis | S: POWERED IND VEHICLE, S: HWY STREET BRIDGE CONSTR, S: FALL FROM HEIGHT, L: ARRACON, L: FALL, L: IDCON |
Case Closed | 2010-10-28 |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Case Closed | 2010-09-29 |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2010-06-15 |
Emphasis | L: FALL |
Case Closed | 2010-06-21 |
Related Activity
Type | Referral |
Activity Nr | 200250108 |
Safety | Yes |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2009-08-27 |
Emphasis | S: POWERED IND VEHICLE, S: HWY STREET BRIDGE CONSTR |
Case Closed | 2010-01-05 |
Related Activity
Type | Referral |
Activity Nr | 200248698 |
Safety | Yes |
Violation Items
Citation ID | 01011 |
Citaton Type | Serious |
Standard Cited | 5A0001 |
Issuance Date | 2009-09-22 |
Abatement Due Date | 2009-09-25 |
Current Penalty | 1375.0 |
Initial Penalty | 1375.0 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 03 |
Hazard | FALLING |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Close Conference | 2009-07-23 |
Case Closed | 2009-07-23 |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2009-06-11 |
Emphasis | S: POWERED IND VEHICLE, S: HWY STREET BRIDGE CONSTR, S: COMMERCIAL CONSTR, S: STRUCK-BY |
Case Closed | 2009-06-19 |
Related Activity
Type | Referral |
Activity Nr | 200248342 |
Safety | Yes |
Health | Yes |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2007-03-08 |
Emphasis | L: IDCON, S: COMMERCIAL CONSTR, S: HWY STREET BRIDGE CONSTR |
Case Closed | 2007-03-19 |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Close Conference | 2006-01-03 |
Case Closed | 2006-01-09 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2004-10-22 |
Case Closed | 2004-10-22 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2003-09-17 |
Emphasis | L: IDCON, S: CONSTRUCTION |
Case Closed | 2003-09-17 |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2001-02-22 |
Emphasis | S: CONSTRUCTION |
Case Closed | 2001-04-06 |
Related Activity
Type | Referral |
Activity Nr | 200234730 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260602 A02 I |
Issuance Date | 2001-03-06 |
Abatement Due Date | 2001-03-16 |
Current Penalty | 750.0 |
Initial Penalty | 750.0 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 03 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2000-12-13 |
Emphasis | S: CONSTRUCTION, L: IDCON |
Case Closed | 2000-12-13 |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 1999-07-30 |
Emphasis | S: CONSTRUCTION |
Case Closed | 1999-08-02 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1999-07-08 |
Emphasis | S: CONSTRUCTION |
Case Closed | 1999-09-09 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260050 C |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-08-10 |
Current Penalty | 1200.0 |
Initial Penalty | 1200.0 |
Nr Instances | 1 |
Nr Exposed | 20 |
Gravity | 01 |
Citation ID | 01002A |
Citaton Type | Other |
Standard Cited | 19260059 E01 |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-08-10 |
Initial Penalty | 1200.0 |
Nr Instances | 1 |
Nr Exposed | 20 |
Gravity | 01 |
Citation ID | 01002B |
Citaton Type | Other |
Standard Cited | 19260059 F05 I |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-08-10 |
Nr Instances | 20 |
Nr Exposed | 20 |
Gravity | 01 |
Citation ID | 01003A |
Citaton Type | Serious |
Standard Cited | 19260150 C01 VI |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-07-21 |
Current Penalty | 700.0 |
Initial Penalty | 1200.0 |
Nr Instances | 1 |
Nr Exposed | 20 |
Gravity | 01 |
Citation ID | 01003B |
Citaton Type | Serious |
Standard Cited | 19260150 C01 VIII |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-07-21 |
Nr Instances | 4 |
Nr Exposed | 20 |
Gravity | 01 |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260050 D02 |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-08-10 |
Nr Instances | 2 |
Nr Exposed | 2 |
Gravity | 01 |
Citation ID | 02002 |
Citaton Type | Other |
Standard Cited | 19260050 F |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-07-20 |
Nr Instances | 1 |
Nr Exposed | 20 |
Gravity | 01 |
Citation ID | 02003 |
Citaton Type | Other |
Standard Cited | 19260303 B |
Issuance Date | 1999-07-15 |
Abatement Due Date | 1999-07-20 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 01 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1999-04-13 |
Emphasis | S: CONSTRUCTION |
Case Closed | 1999-06-14 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260095 A |
Issuance Date | 1999-04-15 |
Abatement Due Date | 1999-04-27 |
Current Penalty | 500.0 |
Initial Penalty | 500.0 |
Nr Instances | 5 |
Gravity | 02 |
Inspection Type | Planned |
Scope | NoInspection |
Safety/Health | Safety |
Case Closed | 1998-11-19 |
Inspection Type | Unprog Rel |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 1997-10-22 |
Case Closed | 1997-10-24 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1992-04-21 |
Case Closed | 1992-06-24 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260405 J01 I |
Issuance Date | 1992-06-04 |
Abatement Due Date | 1992-06-10 |
Current Penalty | 425.0 |
Initial Penalty | 825.0 |
Nr Instances | 2 |
Nr Exposed | 4 |
Gravity | 01 |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260350 A09 |
Issuance Date | 1992-06-04 |
Abatement Due Date | 1992-06-10 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 01 |
Citation ID | 02002 |
Citaton Type | Other |
Standard Cited | 19261052 C01 |
Issuance Date | 1992-06-04 |
Abatement Due Date | 1992-06-10 |
Nr Instances | 2 |
Nr Exposed | 4 |
Gravity | 01 |
Citation ID | 02003 |
Citaton Type | Other |
Standard Cited | 19260404 A02 |
Issuance Date | 1992-06-04 |
Abatement Due Date | 1992-06-10 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 01 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1989-11-09 |
Emphasis | N: TRENCH |
Case Closed | 1989-12-12 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260651 A |
Issuance Date | 1989-11-27 |
Abatement Due Date | 1989-12-30 |
Current Penalty | 350.0 |
Initial Penalty | 640.0 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 08 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1989-06-15 |
Case Closed | 1989-07-05 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1987-12-07 |
Case Closed | 1990-11-07 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260500 B01 |
Issuance Date | 1987-12-22 |
Abatement Due Date | 1987-12-28 |
Current Penalty | 900.0 |
Initial Penalty | 900.0 |
Nr Instances | 1 |
Nr Exposed | 24 |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260700 B02 |
Issuance Date | 1987-12-22 |
Abatement Due Date | 1987-12-28 |
Current Penalty | 900.0 |
Initial Penalty | 900.0 |
Nr Instances | 1 |
Nr Exposed | 24 |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19040002 A |
Issuance Date | 1987-12-22 |
Abatement Due Date | 1988-01-22 |
Nr Instances | 1 |
Nr Exposed | 24 |
Citation ID | 02002 |
Citaton Type | Other |
Standard Cited | 19260303 B |
Issuance Date | 1987-12-22 |
Abatement Due Date | 1987-12-30 |
Nr Instances | 2 |
Nr Exposed | 2 |
Citation ID | 02003 |
Citaton Type | Other |
Standard Cited | 19260350 J |
Issuance Date | 1987-12-22 |
Abatement Due Date | 1987-12-28 |
Nr Instances | 1 |
Nr Exposed | 2 |
Citation ID | 02004 |
Citaton Type | Other |
Standard Cited | 19260404 F07 IVC |
Issuance Date | 1987-12-22 |
Abatement Due Date | 1987-12-30 |
Nr Instances | 1 |
Nr Exposed | 2 |
Citation ID | 02005 |
Citaton Type | Other |
Standard Cited | 19260405 A02 IIJ |
Issuance Date | 1987-12-22 |
Abatement Due Date | 1988-01-04 |
Nr Instances | 1 |
Nr Exposed | 2 |
Inspection Type | Complaint |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 1978-05-25 |
Case Closed | 1978-07-17 |
Related Activity
Type | Complaint |
Activity Nr | 322037235 |
Violation Items
Citation ID | 01001 |
Citaton Type | Other |
Standard Cited | 19260900 K03 I |
Issuance Date | 1978-06-16 |
Abatement Due Date | 1978-06-19 |
Nr Instances | 1 |
Related Event Code (REC) | Complaint |
USDOT Number | Carrier Operation | MCS-150 Form Date | MCS-150 Mileage | MCS-150 Year | Power Units | Drivers | Operation Classification | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
12402 | Interstate | 2023-10-30 | 880524 | 2022 | 101 | 50 | Private(Property) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Total Number of Inspections for the measurement period (24 months) | 0 |
Driver Fitness BASIC Serious Violation Indicator | No |
Vehicle Maintenance BASIC Acute/Critical Indicator | No |
Unsafe Driving BASIC Acute/Critical Indicator | No |
Driver Fitness BASIC Roadside Performance measure value | 0 |
Hours-of-Service (HOS) Compliance BASIC Roadside Performance measure value | 0 |
Total Number of Driver Inspections for the measurment period | 0 |
Vehicle Maintenance BASIC Roadside Performance measure value | 0 |
Total Number of Vehicle Inspections for the measurement period | 0 |
Controlled Substances and Alcohol BASIC Roadside Performance measure value | 0 |
Unsafe Driving BASIC Roadside Performance Measure Value | 0 |
Number of inspections with at least one Driver Fitness BASIC violation | 0 |
Number of inspections with at least one Hours-of-Service BASIC violation | 0 |
Total Number of Driver Inspections containing at least one Driver Out-of-Service Violation | 0 |
Number of inspections with at least one Vehicle Maintenance BASIC violation | 0 |
Total Number of Vehicle Inspections containing at least one Vehicle Out-of-Service violation | 0 |
Number of inspections with at least one Controlled Substances and Alcohol BASIC violation | 0 |
Number of inspections with at least one Unsafe Driving BASIC violation | 0 |
Crashes
Unique state report number for the incident | ID24C6689350 |
Sequence number for each vehicle involved in a crash | 3 |
The date a incident occurred | 2024-07-09 |
State abbreviation | ID |
Total number of fatalities reported in the crash | 0 |
Total number of injuries reported in the crash | 0 |
The vehicle involved in the accident was towed from the scene | Y |
Hazardous materials were released during the accident | N |
Description of the trafficway | Two-Way Trafficway Divided Positive Barrier |
Description of the access control | Full Control |
Description of the road surface condition | Dry |
Description of the weather condition | No Adverse Conditions |
Description of the light condition | Daylight |
Vehicle Identification number (VIN) | 1XKZP40X8NJ480110 |
Vehicle license number | XG2887 |
Vehicle license state | ID |
The severity weight that is assigned to the incident | 1 |
The time weight that is assigned to the incident | 3 |
Sequence number | 1 |
Date of last update: 31 Mar 2025
Sources: Idaho Secretary of State